DOCUMENTS
Application Forms
APPLICATION FORM | 06-10-23 | Application Form - Without Personal Data |
Plans
LOCATION PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 001 Rev. P01 Site Location Plan | ||
DESIGN ACCESS STATEMENT (FULL DOCUMENT) | 05-12-23 | Design & Access Statement (Dated June 2023) AMENDED | ||
SITE LAYOUT - EXISTING | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 005 Rev. 01 Existing Site Plan | ||
NOISE ASSESSMENT | 13-11-23 | 13430A-20-R03-03 Noise Assessment (Dated 15th September 2023) | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-FF-DR-A-08 011 Rev. P01 Main Building First Floor Plan | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-GF-DR-A-08 010 Rev. P01 Main Building Ground Floor Plan | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-RF-DR-A-08 012 Rev. P01 Main Building Roof Plan | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 013 Rev. P01 Main Building Elevations | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 014 Rev. P01 Main Building Sections | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 020 Rev. P01 Workshop - Ground Floor & Roof Plans. | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 021 Rev. P01 Workshop - Elevations & Sections | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 025 Rev. P01 Boat Shed - Plans, Sections & Elevations | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 030 Rev. P01 Activity Shelter - Plan, Sections and Elevations | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 035 Rev. P01 Toilet Block - Plan, Sections and Elevations | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 040 Rev. P01 Energy Centre - Plans, Sections & Elevations | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 045 Rev. P01 Angler's Hut - Plans, Sections & Elevations | ||
PLAN | 13-11-23 | 3859-ASP-ZZ-XX-DR-A-08 050 Rev. P01 BSC Store - Plans, Sections & Elevations | ||
PLAN | 13-11-23 | 5435-FUR-ZZ-XX-DR-C-0801 Rev. P03 Broadwater Lake Dredging Cut/Fill Analysis | ||
PLAN | 13-11-23 | 3859 (03)045 Rev. E Broadwater Lake Masterplan | ||
PLAN | 13-11-23 | HWSAC-COL-00-XX-DR-L-1000 Rev. 04 Landscape masterplan - peninsula | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-1001 Rev. 04 Landscape masterplan - lake | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-1004 Rev. 04 Proposed landscape layout | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-1010 Rev. 14 Ecological mitigation plan | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-2020 Rev. 04 Boundary treatment | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-2021 Rev. 04 Boundary treatment | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-5001 Rev. 03 Tree credit and loss | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-5002 Rev. 05 Planting Strategy (Peninsula - Sheet 1) | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-5003 Rev. 02 Planting Strategy (Lake - Sheet 2) | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-5004 Rev. 02 Planting Strategy (Lake - Sheet 3) | ||
PLAN | 13-11-23 | HWSFAC-COL-00-XX-DR-L-5005 Rev. 02 Rev. 02 Planting Strategy (Lake - Sheet 4) | ||
PLAN | 13-11-23 | HWSFAC-COL-XX-XX-DR-L-6112 Rev. 02 Construction Phasing | ||
PLAN | 13-11-23 | HWSFAC-COL-XX-XX-DR-L-6120 Rev. 03 Construction Phasing - Phase 1 | ||
PLAN | 13-11-23 | HWSFAC-COL-XX-XX-DR-L-6121 Rev. 03 Construction Phasing - Phase 2 | ||
PLAN | 13-11-23 | HWSFAC-COL-XX-XX-DR-L-6122 Rev. 03 Construction Phasing - Phase 3 | ||
PLAN | 13-11-23 | HWSFAC-COL-XX-XX-DR-L-6123 Rev. 03 Construction Phasing - Phase 4 | ||
PLAN | 13-11-23 | HWSFAC-COL-XX-XX-DR-L-6124 Rev. 04 Construction Phasing - Phase 5 | ||
PLAN | 13-11-23 | Sailing Area Calculations |
Supporting Documentation
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 1 Introduction | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 10 - Landscape and Visual | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 11 - Summary | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 2 site and setting | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 3 Methodology | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 4 Alternatives | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 5 Description of Development | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 6 Construction | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 7 Biodiversity | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 8 Water resources and Flood Risk | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 chapter 9 Ground Conditions and contamination | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 Glossary and Abbreviations | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 Table of Contents | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.1 Planning Policy and Local guidance context | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.2 Proposed Landscape and ecological masterplans | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.3 Figures_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.3 Figures_Part2. | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.3 Figures_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.3 Figures_Part4 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.4 Photography of Site from key viewpoints | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.4 Photography of Site from key viewpoints | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.4 Photography of Site from key viewpoints_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.5 AVRs of Proposed Development_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.5 AVRs of Proposed Development_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.5 AVRs of Proposed Development_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.6 Stage 1 and 2 Arboricultural Impact Assement Report_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 10.6 Stage 1 and 2 Arboricultural Impact Assement Report_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 201 Historical Photographs of Broadwater Lake | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 2.2 Site Photographs | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 2.3 HSE Schedule | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.1 Location of specified information in ES | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping Report Part 1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 10 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 11 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 12 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 13 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 14 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 15 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 15 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 17 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 18 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 19 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 20 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 21 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 22 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 23 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 4 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 5 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 6 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 7 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 8 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.2 EIA Scoping report part 9 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.3 LBH EIA Scoping Opinion | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 3.4 Response to Draft Scoping Opinion | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 4.1 Alternative Site Assessment | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 4.2 Alternative Peninsula Layouts_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 4.2 Alternative Peninsula Layouts_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 4.2 Alternative Peninsula Layouts_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 4.2 Alternative Peninsula Layouts_Part4 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 4.2 Alternative Peninsula Layouts_Part5 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 4.2 Alternative Peninsula Layouts_Part6 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.1 Planning Application Drawings_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.1 Planning Application Drawings_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.1 Planning Application Drawings_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.2 Landscape Stategy_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.2 Landscape Stategy_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.2 Landscape Stategy_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.2 Landscape Stategy_Part4 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.2 Landscape Stategy_Part5 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.2 Landscape Stategy_Part6 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 5.2 Landscape Stategy_Part7 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 6.1 CEMP.1.6.F | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 6.2 Construction Phasing Drawings | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part10 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part11 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part12 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part4 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part5 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part6 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | Filename ES Volume 2 Appendix 7.1 PEA_Part6_1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part7 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part8 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.1 PEA_Part9 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.10 Bat Survey_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.10 Bat Survey_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.11 Biodiversity Net Gain Assessment_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.11 Biodiversity Net Gain Assessment_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.12 Biodiversity Air Quality Assessment | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.13 NE descretionary advice | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.2 Figures_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.2 Figures_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.2 Figures_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.2 Figures_Part4 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.3 SSSI Impact Assessment_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.3 SSSI Impact Assessment_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.3 SSSI Impact Assessment_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.4 Draft MEMP vol 1_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.4 Draft MEMP vol 1_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.4 Draft MEMP vol 1_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.5 Draft MEMP Vol 2 Parts A-D_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.5 Draft MEMP Vol 2 Parts A-D_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.5 Draft MEMP Vol 2 Parts A-D_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.5 Draft MEMP Vol 2 Parts A-D_Part4 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.6 Wintering bird and disturbance | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.7 Breeding Bird Survey Report (August 2023) | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.8 Invertebrate Survey Report | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 7.9 Ecology Report Redacted | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.1 Legislation and Policy | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.2 FRA_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.2 FRA_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.2 FRA_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.2 FRA_Part4 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.3 Groundwater Risk Assessment | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.4 Water Framework Directive Assessment_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.4 Water Framework Directive Assessment_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.5 Lake Water Column Profiles | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.6 Bathing Water Assessment Part 1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.6 Bathing Water Assessment Part 2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 8.7_ Draft Lake Management Plan | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.1 Relevant Planning Policy | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.2 Phase I Geo-environmental_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.2 Phase I Geo-environmental_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.2 Phase I Geo-environmental_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.2 Phase I Geo-environmental_Part4 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.2 Phase I Geo-environmental_Part5 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.2 Phase I Geo-environmental_Part6 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.2 Phase I Geo-environmental_Part7 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.2 Phase I Geo-environmental_Part8 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.3 Phase II Geo-environmental_Part1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.3 Phase II Geo-environmental_Part2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.3 Phase II Geo-environmental_Part3 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.4 Drawing 1 Landfill | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.5 Preliminary Explosive Ordnance RA Part 1 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Appendix 9.5 Preliminary Explosive Ordnance RA Part 2 | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Front Cover | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 2 Table of Contents | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | ES Volume 1 Front Cover Sheet | ||
ENVIRONMENTAL ASSESSMENT STATEMENT | 13-11-23 | Q220454 Environmental Statement Non-Technical Summary (Dated November 2023) | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 1 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 10 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 11 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 12 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 13 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 14 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 15 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 16 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 17 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 18 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 2 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 3 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 4 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 5 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 6 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 7 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 8 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 2740X1 - Broadwater lakes - Topographical 9 of 18 | ||
SUPPORTING INFORMATION | 13-11-23 | Alternative Sites Assessment | ||
SUPPORTING INFORMATION | 13-11-23 | JAC 28557 Archaeological Desk-Based Assessment (Dated September 2023) | ||
SUPPORTING INFORMATION | 13-11-23 | J20/13430A/10/3/F3 Biodiversity Air Quality Modelling Assessment (Dated September 2023) | ||
SUPPORTING INFORMATION | 13-11-23 | 2915/068/004B Detailed Construction Logistics Plan (Dated September 2023) | ||
SUPPORTING INFORMATION | 13-11-23 | Gateway One Fire Statement | ||
SUPPORTING INFORMATION | 13-11-23 | L-2121-DOC-002 - Rev 032 Landscape Strategy (Dated 29th September 2023) | ||
SUPPORTING INFORMATION | 13-11-23 | 22-10070 Rev. R02 Lighting Impact Assessment (Dated 8th November 2023) | ||
SUPPORTING INFORMATION | 13-11-23 | Q220379 Planning Statement (Dated November 2023) | ||
SUPPORTING INFORMATION | 13-11-23 | Q230225 Social and Community Benefits Statement (Dated September 2023) | ||
SUPPORTING INFORMATION | 13-11-23 | Statement of Community Involvement | ||
SUPPORTING INFORMATION | 13-11-23 | Topographic Survey Pages 1 to 18 | ||
SUPPORTING INFORMATION | 13-11-23 | 23-033 Rev. D Utilities Report (Dated September 2023) | ||
SUPPORTING INFORMATION | 14-11-23 | 22-10070 Circular Economy Statement (Dated November 2023) | ||
SUPPORTING INFORMATION | 14-11-23 | Circular Economy Spreadsheet GLA Spreadsheet | ||
SUPPORTING INFORMATION | 14-11-23 | 22-10070 Whole Life-Cycle Carbon Assessment (Dated November 2023) | ||
SUPPORTING INFORMATION | 14-11-23 | Whole Lifecyle Carbon Assessment GLA Spreadsheet | ||
SUPPORTING INFORMATION | 06-03-24 | Aviation Glint and Glare Assessment (Dated 26th February 2024) | ||
SUPPORTING INFORMATION | 07-03-24 | Aviation Glint and Glare Assessment Appendix A - Figure 1 - Site Layout | ||
SUPPORTING INFORMATION | 07-03-24 | Aviation Glint and Glare Assessment Appendix A - Figure 2 - Denham Airport Aerodrome Chart | ||
SUPPORTING INFORMATION | 07-03-24 | Aviation Glint and Glare Assessment Appendix A - Figure 3 - Elstree Airport Aerodrome Chart | ||
SUPPORTING INFORMATION | 07-03-24 | Aviation Glint and Glare Assessment Appendix A - Figure 4 - RAF Northolt Aerodrome Chart | ||
SUPPORTING INFORMATION | 07-03-24 | Aviation Glint and Glare Assessment Appendix A - Figure 5 - London Heathrow Airport Aerodrome Chart | ||
SUPPORTING INFORMATION | 07-03-24 | Aviation Glint and Glare Assessment Appendix B - Aviation Receptor Glare Results | ||
SUPPORTING INFORMATION | 07-03-24 | Aviation Glint and Glare Assessment Appendix C - Visibility Assessment Evidence | ||
SUPPORTING INFORMATION | 07-03-24 | Aviation Glint and Glare Assessment Appendix D - Solar Module Glare and Reflectance Technical Memo | ||
ADVERTISEMENT NOTICE | 07-12-23 | |||
ADVERTISEMENT NOTICE | 07-12-23 | |||
AIR QUALITY REPORT | 13-11-23 | J20/13430A/10/1/F4 Air Quality Assessment (Dated 1st November 2023) | ||
CULTURAL AND HERITAGE ASSESSMENT | 13-11-23 | JAC28557 Version 2 Built Heritage Statement (Dated July 2023) | ||
TRANSPORT ASSESSMENT | 13-11-23 | 2915/068/005B Delivery and Servicing Plan (Dated November 2023) | ||
ENERGY REPORT | 13-11-23 | 23-10070 Rev. A Energy Strategy Report (Dated July 2023) | ||
FLOOD AND DRAINAGE ASSESSMENT | 13-11-23 | Flood Risk Drainage and Sequential Assessment v1.0 (Dated September 2023) | ||
ECOLOGY REPORT | 13-11-23 | Mitigation and Ecological Management Plan Volume 1 (Dated October 2023) | ||
ECOLOGY REPORT | 13-11-23 | Mitigation and Ecological Management Plan Volume 2 Part A (Dated November 2023) | ||
ECOLOGY REPORT | 13-11-23 | Mitigation and Ecological Management Plan Volume 2 Part B (Dated November 2023) | ||
ECOLOGY REPORT | 13-11-23 | Mitigation and Ecological Management Plan Volume 2 Part C (Dated November 2023) | ||
ECOLOGY REPORT | 13-11-23 | Mitigation and Ecological Management Plan Volume 2 Part D (Dated November 2023) | ||
TRANSPORT ASSESSMENT | 13-11-23 | 2915/068/006B Parking Design and Management Plan (Dated November 2023) | ||
LAND ASSESSMENT | 13-11-23 | 23-09-03A Issue 1 Phase I Environmental Desk Study Report (Dated September 2023) | ||
LAND ASSESSMENT | 13-11-23 | 23-09-03B Issue 1 Phase II Geotechnical and Geo-Environmental Report (Dated September 2023) | ||
TRANSPORT ASSESSMENT | 13-11-23 | 2915/068/002B Transport Assessment (Dated November 2023) | ||
TRANSPORT ASSESSMENT | 13-11-23 | 2915/068/003B Travel Plan (Dated November 2023) | ||
TREE/LANDSCAPING REPORT | 13-11-23 | 2484793 Rev. 4 Tree Survey and Arboricultural Impact Assessment Report (Dated 28th September 2023) | ||
ECOLOGY REPORT | 21-11-23 | Biodiversity Metric 4.0 Calculation Tool | ||
FLOOD AND DRAINAGE ASSESSMENT | 29-02-24 | Flood Risk and Drainage Clarification Note (Dated 13th February 2024) |
Decision Documentation
There are no documents for this section |