DOCUMENTS

Application Forms
APPLICATION FORM 31-03-21 Application Form - Without Personal Data

Plans
LOCATION PLAN 31-03-21 17115_05_00_07_001 Rev. P1 Site Location Plan
SITE LAYOUT - ACCESS/PARKING 31-03-21 17115_05_00_07_051 Rev. P1 Proposed Sitewide Access and Routes
SITE LAYOUT - ACCESS/PARKING 31-03-21 17115_05_00_07_052 Rev. P1 Proposed Sitewide Emergency Services Access
SITE LAYOUT - ACCESS/PARKING 31-03-21 17115_05_00_07_053 Rev. P1 Proposed Sitewide Parking Strategy
SITE LAYOUT - ACCESS/PARKING 31-03-21 17115_05_00_07_054 Rev. P1 Proposed Sitewide Refuse Strategy
EXISTING FLOOR PLANS 31-03-21 17115_05_00_07_010 Rev. P1 Existing Site: Ground Floor Plan
EXISTING FLOOR PLANS 31-03-21 17115_05_00_07_011 Rev. P1 Existing Site: First Floor Plan
EXISTING ELEVATIONS 31-03-21 17115_05_00_07_200 Rev. P1 Existing: Sitewide Elevations
EXISTING ELEVATIONS 31-03-21 17115_05_00_07_021 Rev. P1 Existing Cottage Hospital: Elevations Sheet 1
EXISTING ELEVATIONS 31-03-21 17115_05_00_07_022 Rev. P1 Existing Cottage Hospital: Elevations Sheet 2
PROPOSED FLOOR PLANS 31-03-21 17115_05_00_07_100 Rev. P1 Proposed Level 00 Sitewide Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_A_07_100 Rev. P1 Block A Residential: Proposed Level 00 Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_A_07_101 Rev. P1 Block A Residential: Proposed Level 01 Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_A_07_102 Rev. P1 Block A Residential: Proposed Level 02 Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_A_07_103 Rev. P1 Block A Residential: Proposed Level 03 Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_B_07_100 Rev. P1 Block B Residential: Proposed Level 00 Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_B_07_101 Rev. P1 Block B Residential: Proposed Level 01 Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_B_07_102 Rev. P1 Block B Residential: Proposed Level 02 Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_B_07_103 Rev. P1 Block B Residential: Proposed Level 03 Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_HC_07_100 Rev. P1 Healthcare Centre: Proposed Level 00 Plan
PROPOSED FLOOR PLANS 31-03-21 17115_05_HC_07_101 Rev. P1 Healthcare Centre: Proposed Level 01 Plan
PROPOSED FLOOR PLANS AMENDED 25-08-21 17115_05_A_07_103 Rev. P2 Block A Residential: Proposed Level 03 Plan received 25/8/21
PROPOSED FLOOR PLANS AMENDED 25-08-21 17115_05_B_07_100 Rev. P2 Block B Residential: Proposed Level 00 Plan received 25/8/21
PROPOSED FLOOR PLANS AMENDED 25-08-21 17115_05_B_07_101 Rev. P2 Block B Residential: Proposed Level 01 Plan received 25/8/21
PROPOSED FLOOR PLANS AMENDED 25-08-21 17115_05_B_07_102 Rev. P2 Block B Residential: Proposed Level 02 Plan received 25/8/21
PROPOSED FLOOR PLANS AMENDED 25-08-21 17115_05_B_07_103 Rev. P2 Block B Residential: Proposed Level 03 Plan received 25/8/21
PROPOSED FLOOR PLANS AMENDED 25-08-21 17115_05_00_07_100 Rev. P2 Proposed Level 00 Sitewide Plan received 25.8.21
PROPOSED FLOOR PLANS AMENDED 22-12-21 17115_05_B_07_101 Rev. P3 Block B Residential: Proposed Level 01 Plan received 1/12/21
PROPOSED ELEVATIONS 31-03-21 17115_05_00_07_200 Rev. P1 Proposed Sitewide Elevations
PROPOSED ELEVATIONS 31-03-21 17115_05_A_07_200 Rev. P1 Block A Residential: Proposed Elevations Sheet 1
PROPOSED ELEVATIONS 31-03-21 17115_05_A_07_201 Rev. P1 Block A Residential: Proposed Elevations Sheet 2
PROPOSED ELEVATIONS 31-03-21 17115_05_B_07_200 Rev. P1 Block B Residential: Proposed Elevations Sheet 1
PROPOSED ELEVATIONS 31-03-21 17115_05_B_07_201 Rev. P1 Block B Residential: Elevations Sheet 2
PROPOSED ELEVATIONS 31-03-21 17115_05_HC_07_200 Rev. P1 Healthcare Centre: Proposed Elevations Sheet 1
PROPOSED ELEVATIONS 31-03-21 17115_05_HC_07_201 Rev. P2 Healthcare Centre: Proposed Elevations Sheet 2
PROPOSED ELEVATIONS AMENDED 25-08-21 17115_05_A_07_200 Rev. P2 Block A Residential: Proposed Elevations Sheet 1 received 25/8/21
PROPOSED ELEVATIONS AMENDED 25-08-21 17115_05_A_07_201 Rev. P2 Block A Residential: Proposed Elevations Sheet 2 received 25/8/21
PROPOSED ELEVATIONS AMENDED 25-08-21 17115_05_B_07_200 Rev. P2 Block B Residential: Proposed Elevations Sheet 1 received 25/8/21
PROPOSED ELEVATIONS AMENDED 25-08-21 17115_05_B_07_201 Rev. P2 Block B Residential: Proposed Elevations Sheet 2 received 25/8/21
PROPOSED ELEVATIONS AMENDED 25-08-21 17115_05_HC_07_201 Rev. P2 Healthcare Centre: Proposed Elevations Sheet 2 received 25/8/21
PROPOSED ELEVATIONS AMENDED 25-08-21 17115_05_00_07_200 Rev. P2 Proposed Sitewide Elevations received 25/8/21
PROPOSED ELEVATIONS AMENDED 22-12-21 17115_05_B_07_201 Rev. P3 Block B Residential: Elevations Sheet 2 received 1/12/21
PROPOSED ELEVATIONS AMENDED 16-12-22 17115_05_HC_07_200 Rev. P2 Healthcare Centre - Proposed Elevations Sheet 1 received 25/8/21
PROPOSED ROOF PLANS 31-03-21 17115_05_00_07_104 Rev. P1 Proposed Roof Level Sitewide Plan
PROPOSED ROOF PLANS 31-03-21 17115_05_A_07_104 Rev. P1 Block A Residential: Proposed Roof Plan
PROPOSED ROOF PLANS 31-03-21 17115_05_B_07_104 Rev. P1 Block B Residential: Planning Roof Plan
PROPOSED ROOF PLANS 31-03-21 17115_05_HC_07_102 Rev. P1 Healthcare Centre: Proposed Roof Plan
PROPOSED SECTIONS 31-03-21 17115_05_A_07_300 Rev. P1 Block A Residential: Proposed Sections
PROPOSED SECTIONS 31-03-21 17115_05_B_07_300 Rev. P1 Block B Residential: Proposed Sections
PROPOSED SECTIONS 31-03-21 17115_05_HC_07_300 Rev. P1 Healthcare Centre: Proposed Sections
PROPOSED ROOF PLANS AMENDED 25-08-21 17115_05_A_07_104 Rev. P2 Block A Residential: Proposed Roof Plan Plan received 25/8/21
PROPOSED SECTIONS AMENDED 25-08-21 17115_05_A_07_300 Rev. P2 Block A Residential: Proposed Sections received 25/8/21
PROPOSED ROOF PLANS AMENDED 25-08-21 17115_05_B_07_104 Rev. P2 Block B Residential: Proposed Roof Plan received 25/8/21
PROPOSED SECTIONS AMENDED 25-08-21 17115_05_B_07_300 Rev. P2 Block B Residential: Proposed Sections received 25/8/21
PROPOSED ROOF PLANS AMENDED 25-08-21 17115_05_00_07_104 Rev. P2 Proposed Roof Level Sitewide Plan received 25/8/21
PLAN 31-03-21 17115_05_00_07_002 Rev. P1 Site Boundary Plan
PLAN 31-03-21 17115_05_A_07_400 Rev. P1 Blocks A & B: East/ West Elevation Bay Study
PLAN 31-03-21 17115_05_A_07_401 Rev. P1 Blocks A & B: North/ South Elevation Bay Study
PLAN 31-03-21 17115_05_A_07_402 Rev. P1 Blocks A & B: Porches & Bays Study
PLAN 31-03-21 17115_05_HC_07_400 Rev. P1 Healthcare Centre: West Elevation Infill Bay Study
PLAN 31-03-21 17115_05_HC_07_401 Rev. P1 Healthcare Centre: New Extension Bay Study
PLAN 31-03-21 17115_05_HC_06_402 Rev. P1 Healthcare Centre: Entrance Canopy Bay Study
PLAN 26-08-21 Access Plan attached to agent's email dated 25/8/21 re response to Access Officer's comments
PLAN 22-12-21 Proposed Site Wide Plan: Residential Demise Area Consideration
PLAN AMENDED 25-08-21 17115_05_A_07_400 Rev. P2 Block A & B: East/West Elevation Bay Study received 25/8/21
PLAN AMENDED 25-08-21 17115_05_A_07_401 Rev. P2 Block A & B: North / South Elevation Bay Study received 25/8/21
PLAN AMENDED 25-08-21 17115_05_A_07_402 Rev. P2 Block A & B: Porches & Bays Bay Study received 25/8/21
PLAN AMENDED 21-12-21 17115_05_A_07_200 Rev. P3 Block A Residential: Proposed Elevations Sheet 1 received 20.12.21
PLAN AMENDED 21-12-21 17115_05_A_07_100 Rev. P2 Block A Residential - Proposed Level 00 Plan received 20.12.21
PLAN AMENDED 21-12-21 17115_05_A_07_104 Rev. P3 Block A Residential: Proposed Roof Plan received 20.12.21
PLAN AMENDED 21-12-21 17115_05_A_07_300 Rev. P3 Block A Residential: Proposed Sections received 20.12.21
PLAN AMENDED 21-12-21 17115_05_B_07_100 Rev. P3 Block B Residential: Proposed Level 00 Plan received 20.12.21
PLAN AMENDED 21-12-21 17115_05_B_07_104 Rev. P3 Block B Residential: Roof Plan received 20.12.21
PLAN AMENDED 21-12-21 17115_05_HC_07_100 Rev. P2 Healthcare Centre: Proposed Level 00 Plan received 20.12.21
PLAN AMENDED 21-12-21 17115_05_HC_07_102 Rev. P2 Healthcare Centre: Proposed Roof Plan received 20.12.21
PLAN AMENDED 21-12-21 17115_05_00_07_100 Rev. P3 Proposed Level 00 Sitewide Plan received 20.12.21
PLAN AMENDED 21-12-21 17115_05_00_07_104 Rev. P3 Proposed Roof Level Sitewide Plan received 20.12.21
PLAN AMENDED 21-12-21 17115_05_00_07_051 Rev. P2 Proposed Sitewide Access and Routes received 20.12.21
PLAN AMENDED 21-12-21 17115_05_00_07_200 Rev. P3 Proposed Sitewide Elevations received 20.12.21
PLAN AMENDED 21-12-21 17115_05_00_07_052 Rev. P2 Proposed Sitewide Emergency Services Access received 20.12.21
PLAN AMENDED 21-12-21 17115_05_00_07_053 Rev. P2 Proposed Sitewide Parking Strategy received 20.12.21
PLAN AMENDED 21-12-21 17115_05_00_07_054 Rev. P2 Proposed Sitewide Refuse Strategy received 20.12.21

Supporting Documentation
DESIGN AND ACCESS STATEMENT 21-09-21 Design & Access Statement Addendum
DESIGN AND ACCESS STATEMENT 25-11-21 DESIGN AND ACCESS STATEMENT ADDENDUM
DESIGN AND ACCESS STATEMENT 21-12-21 Design and Access Statement Addendum 2 received 20.12.21
SUPPORTING INFORMATION 31-03-21 01. Schedule of Application Documents User Defined Attachment
SUPPORTING INFORMATION 31-03-21 05. Schedule 2 - Drawing Schedule User Defined Attachment
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part1 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part10 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part11 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part12 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part13 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part14 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part15. Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part16 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part17 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part18a Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part18b Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part19 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part2 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part20 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part21 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part22 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part3 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part4 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part5 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part6 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part7 Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part8a Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part8b Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part8c Design & access statement
SUPPORTING INFORMATION 31-03-21 08. Design and Access Statement v2_Part9 Design & access statement
SUPPORTING INFORMATION 31-03-21 09. Heritage Statemen Heritage statement
SUPPORTING INFORMATION 31-03-21 10. Energy and Sustainability Statement User Defined Attachment
SUPPORTING INFORMATION 31-03-21 11. Site Level Survey User Defined Attachment
SUPPORTING INFORMATION 31-03-21 13. Ground Floor Landscaping Plan User Defined Attachment
SUPPORTING INFORMATION 31-03-21 13. Response to Existing Trees User Defined Attachment
SUPPORTING INFORMATION 31-03-21 13. Tree Planting Plan User Defined Attachment
SUPPORTING INFORMATION 31-03-21 14. Fire Stratedgy User Defined Attachment
SUPPORTING INFORMATION 31-03-21 15. Transport Asessment Part 1 Transport Assessment
SUPPORTING INFORMATION 31-03-21 15. Transport Assessment Part 2 Transport Assessment
SUPPORTING INFORMATION 31-03-21 15. Transport Assessment Part 3 Transport Assessment
SUPPORTING INFORMATION 31-03-21 15. Transport Assessment Part 4. Transport Assessment
SUPPORTING INFORMATION 31-03-21 16. Travel Plan Travel plan
SUPPORTING INFORMATION 31-03-21 17. Noise Impact Assessment Noise impact assessment
SUPPORTING INFORMATION 31-03-21 18. Flood Risk Assessment Flood risk assessment
SUPPORTING INFORMATION 31-03-21 19. Drainage Stratedgy. User Defined Attachment
SUPPORTING INFORMATION 31-03-21 20. Land Contamination Repor User Defined Attachment
SUPPORTING INFORMATION 31-03-21 21. Financial Viability Assessment_Part1 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 21. Financial Viability Assessment_Part2 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 21. Financial Viability Assessment_Part3 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 21. Financial Viability Assessment_Part4 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 21. Financial Viability Assessment_Part5 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 21. Financial Viability Assessment_Part6 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 22. Air Quality Assessment and Air Quality Neutral Air quality assessment
SUPPORTING INFORMATION 31-03-21 23. Ecological Appraisal - Appendix D E (1) User Defined Attachment
SUPPORTING INFORMATION 31-03-21 23. Ecological Appraisal. User Defined Attachment
SUPPORTING INFORMATION 31-03-21 24. Sunlight and Daylight Assessment Daylight or Sunlight assessment
SUPPORTING INFORMATION 31-03-21 25. Statement of Community Engagement. Statement of community involvement
SUPPORTING INFORMATION 31-03-21 26. Utilities Report User Defined Attachment
SUPPORTING INFORMATION 31-03-21 27. Construction Waste Management Plan_Part1 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 27. Construction Waste Management Plan_Part2 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 27. Construction Waste Management Plan_Part3 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 27. Construction Waste Management Plan_Part4 User Defined Attachment
SUPPORTING INFORMATION 31-03-21 27. Construction Waste Management Plan_Part5. User Defined Attachment
SUPPORTING INFORMATION 31-03-21 28. Community Infratructure Levy Question Form CIL questions
SUPPORTING INFORMATION 31-03-21 29. Archaeoloigcal Assessment User Defined Attachment
SUPPORTING INFORMATION 31-03-21 A summary of the attachments in the proposal
SUPPORTING INFORMATION 06-05-21 Planning Statement
SUPPORTING INFORMATION 17-08-21 Montagu Evans letter dated 2/8/21
SUPPORTING INFORMATION 25-08-21 Revised Drawing Plan List received 25/8/21
SUPPORTING INFORMATION 26-08-21 Agent's email dated 25/8/21 re Response to Access Officer's comments
SUPPORTING INFORMATION 26-08-21 Agent's covering email dated 25/8/21 re revised plans
SUPPORTING INFORMATION 26-08-21 Agent's covering email dated 25/8/21 re. amenity
SUPPORTING INFORMATION 26-08-21 Avison Young letter dated 25/8/21
SUPPORTING INFORMATION 20-12-21 Fire Safety Strategy Stage 2 Report, Rev. 04
SUPPORTING INFORMATION 21-12-21 Drawing Issue Sheet received 20.12.21
SUPPORTING INFORMATION 22-12-21 Drawing Issue Sheet received 1/12/21
SUPPORTING INFORMATION 14-01-22 NHS NW London Clinical Commissioning Group letter dated 12/1/22
SUPPORTING INFORMATION 11-03-22 Final FVA Appendix - Breakeven profit
SUPPORTING INFORMATION 11-03-22 Final FVA Appendix - Breakeven sales value
SUPPORTING INFORMATION 11-03-22 Final FVA Appendix
SUPPORTING INFORMATION 10-06-22 NHS Letter dated 16/2/22
SUPPORTING INFORMATION 12-09-22 NHS Property Services Position Statement dated 8/9/22
ADVERTISEMENT NOTICE 12-05-21 Advertised in Gazette 28.4.21
ADVERTISEMENT NOTICE 10-09-21 Advertised in Gazette 8.9.21
TREE/LANDSCAPING REPORT 19-04-21 Arboricultural Impact Assessment (Part 2)
TREE/LANDSCAPING REPORT 19-04-21 Arboricultural Impact Assessment (Part 1)
ECOLOGY REPORT 19-10-21 Ecology Report
TREE/LANDSCAPING REPORT 21-12-21 Landscape Addendum to DAS, December 2021 received 20.12.21
TRANSPORT ASSESSMENT 21-12-21 Transport Addendum dated 20 December 2021 received 20.12.21
ADDITIONAL DOCUMENTS 25-02-22 Legal Instruction

Decision Documentation
DECISION NOTICE 31-08-23
OFFICER REPORT 26-11-21 November Committee Report
OFFICER REPORT 01-07-22 January 2022 Committee Report
OFFICER REPORT 19-10-22 January 2022 Committee Report
OFFICERS REPORTS 31-08-23
SECTION 106 AGREEMENT 30-08-23 S106 Agreement dated 25.8.23
SECTION 106 AGREEMENT 06-09-23 S106 dated 25/08/2023 - Corrupted file, ignore
SECTION 106 AGREEMENT 20-05-24 S106 dated 25/08/2023