DOCUMENTS

Application Forms
APPLICATION FORM 25-05-22 Application Form - Without Personal Data

Plans
PLAN AMENDED 18-10-22 SK1 Rev. E Revised- Sketch of Levels (Received on 07/10/22)
PLAN AMENDED 18-10-22 SK1 Rev. C Superseded- Sketch of levels (Received on 03/10/22)
PLAN AMENDED 18-10-22 SK1 Rev. B Superseded - Sketch of Levels (Received on 07.09.22)

Supporting Documentation
SUPPORTING INFORMATION 25-05-22 Superseded- Schedule of Condition and Photographs
SUPPORTING INFORMATION 25-05-22 Superseded- Fernhurst Design Ltd letter (dated 18th May 2022)
SUPPORTING INFORMATION 26-09-22 Design Calculations by Prime Scaffold and Structural Design Ltd dated 11.08.2022 - received on 17/08/22
SUPPORTING INFORMATION 26-09-22 Design Check Certificate Cat 2- Internal Check by Prime Scaffold and Structural Ltd dated 09.08.2022 - received on 17/08/22
SUPPORTING INFORMATION 26-09-22 A/10553-1A Proposed Scaffold Layout Plan Views - received on 17/08/22
SUPPORTING INFORMATION 26-09-22 A/10553-2A Proposed Scaffold Layout Section & Elevation Details - received on 17/08/22
SUPPORTING INFORMATION 26-09-22 Superseded- Figure 1 Design Line, Figure 2 Pile Loads, Figure 3 Design Sheet, Figure 4 Pile Schedule, Pile 5 Piling Layout - received on 17/08/22
SUPPORTING INFORMATION 26-09-22 Superseded- CADS Piled Wall Suite Version 6.09 Design of embedded retaining walls and cofferdams, Contiguous Piled Wall Long Term, dated 03.08.2022 -received on 17/08/22
SUPPORTING INFORMATION 26-09-22 Superseded- CADS Piled Wall Suite Version 6.09 Design of embedded retaining walls and cofferdams, Contiguous Piled Wall Short Term, dated 03.08.2022 - received on 17/08/22
SUPPORTING INFORMATION 26-09-22 Superseded- Design/Assessment and/ Or Check Certificate (Categories 0,1,2 or 3) - received on 17/08/22
SUPPORTING INFORMATION 26-09-22 SK1 Superseded- Sketch of Levels -received on 17/08/22
SUPPORTING INFORMATION 26-09-22 H0920-T Site Survey - received on 07/09/22
SUPPORTING INFORMATION 26-09-22 Superseded- Contiguous Pile Wall Design and bearing piles Calculations by Geobond Piling & Foundation Solution dated 01/08/2022 - received on 17/08/22
SUPPORTING INFORMATION 26-09-22 Superseded- Operation Method Statement and Risk Assessment -received on 17/08/22
SUPPORTING INFORMATION 18-10-22 Superseded- AIP Appendix A v2 (Received on 03/10/22)
SUPPORTING INFORMATION 18-10-22 Superseded- AIP version 1 (received on 07/10/22)
SUPPORTING INFORMATION 18-10-22 Superseded- Ground Level Survey, Existing Elevations, Existing & Proposed Site Plan, Proposed Ground Floor Plan & Landscaping, Proposed First Floor Plan and Second Floor Plan, Proposed Roof Plan, Proposed Elevations, Proposed Sections, Proposed Elevations showing Boundary treatment, Block Plan showing vehicular crossover, (Not approved Proposed Elevation with lift overun) received on 07/10/22
SUPPORTING INFORMATION 18-10-22 Revised- Figure 1 Design Line, Figure 2 Pile Loads, Figure 3 Design Sheet, Figure 4 Pile Schedule, Pile 5 Piling Layout (received on 03/10/22)
SUPPORTING INFORMATION 18-10-22 Revised- CADS Piled Wall Suite Version 6.09 Design of embedded retaining walls and cofferdams, Contiguous Piled Wall Long Term, dated 03.08.2022 - Received on 03/10/22
SUPPORTING INFORMATION 18-10-22 Revised CADS Piled Wall Suite Version 6.09 Design of embedded retaining walls and cofferdams, Contiguous Piled Wall Short Term, dated 03.08.2022 (received on 03/10/22)
SUPPORTING INFORMATION 18-10-22 Revised- Design/Assessment and/ Or Check Certificate (Categories 0,1,2 or 3) (received on 07/10/22)
SUPPORTING INFORMATION 18-10-22 Revised- Design for Contiguous Pile Wall & Bearing Piles Calculations by Geobond (received on 07/10/22)
SUPPORTING INFORMATION 18-10-22 Superseded- Design for Contiguous Pile Wall & Bearing Piles Calculations by Geobond (received on 03/10/22)
SUPPORTING INFORMATION 18-10-22 Revised- Operation Method Statement and Risk Assessment -received 03/10/22
SUPPORTING INFORMATION 18-10-22 Geotechnical Ground Investigation Report by STM Environmental dated 03/05/22 (received on 07/10/22)
SUPPORTING INFORMATION 03-11-22 Schedule of Condition and Photographs (received on 27.10.22)
SUPPORTING INFORMATION 03-11-22 Superseded- AIP V2 (received on 18.10.22)
SUPPORTING INFORMATION 03-11-22 Superseded AIP V3 (received on 27/10/22)
SUPPORTING INFORMATION 03-11-22 AIP V4 (received on 28.10.22)

Decision Documentation
DECISION NOTICE 04-11-22
OFFICERS REPORTS 04-11-22