DOCUMENTS
Application Forms
| APPLICATION FORM | 22-05-23 | SUPERSEDED Application Form - Without Personal Data | ||
| APPLICATION FORM | 16-06-23 | AMENDED Application Form Redacted |
Plans
| LOCATION PLAN | 22-05-23 | 0419-SEW-ZZ-ZZ-DR-A-000003 Rev. P1 Existing Location Plan SUPERSEDED | ||
| LOCATION PLAN AMENDED | 20-06-23 | 0419-SEW-ZZ-ZZ-DR-A-000003 Rev. P2 Location Plan AMENDED | ||
| BLOCK PLAN | 22-05-23 | 0419-SEW-ZZ-ZZ-DR-A-000001 Rev. P1 Site Plan SUPERSEDED | ||
| EXISTING FLOOR PLANS | 22-05-23 | 0419-SEW-HPC-00-DR-A-000011 Rev. P1 Existing Ground Floor Plan - HPC | ||
| EXISTING FLOOR PLANS | 22-05-23 | 0419-SEW-HPC-01-DR-A-000012 Rev. P1 Existing First Floor Plan - HPC | ||
| EXISTING FLOOR PLANS | 22-05-23 | 0419-SEW-HPC-02-DR-A-000013 Rev. P1 Existing Second Floor Plan - HPC | ||
| EXISTING FLOOR PLANS | 22-05-23 | 0419-SEW- HPS-00-DR-A-000016 Rev. P1 Existing Ground Floor Plan - HPS | ||
| EXISTING FLOOR PLANS | 22-05-23 | 0419-SEW-HPS-01-DR-A-000017 Rev. P1 Existing First Floor Plan - HPS | ||
| EXISTING FLOOR PLANS | 22-05-23 | 0419-SEW-HPS-02-DR-A-000018 Rev. P1 Existing Second Floor Plan - HPS | ||
| EXISTING FLOOR PLANS | 22-05-23 | 0419-SEW-HPS-03-DR-A-000019 Rev. P1 Existing Roof Plan - HPS | ||
| EXISTING FLOOR PLANS | 22-05-23 | 0419-SEW-HPS-B1-DR-A-000015 Rev. P1 Existing Lower Ground Floor Plan - HPS | ||
| NOISE ASSESSMENT | 20-06-23 | Noise Assessment (Dated May 2023) AMENDED | ||
| EXISTING FRONT ELEVATIONS | 22-05-23 | 0419-SEW-HPC-ZZ-DR-A-000031 Rev. P1 Existing East Elevation - HPC | ||
| EXISTING FRONT ELEVATIONS | 22-05-23 | 0419-SEW-HPS-ZZ-DR-A-000035 Rev. P1 Existing East Elevation - HPS | ||
| EXISITNG SIDE ELEVATIONS | 22-05-23 | 0419-SEW-HPC-ZZ-DR-A-000030 Rev. P1 Existing North Elevation - HPC | ||
| EXISITNG SIDE ELEVATIONS | 22-05-23 | 0419-SEW-HPC-ZZ-DR-A-000032 Rev. P1 Existing South Elevation - HPC | ||
| EXISITNG SIDE ELEVATIONS | 22-05-23 | 0419-SEW-HPS-ZZ-DR-A-000034 Rev. P1 Existing North Elevation - HPS | ||
| EXISITNG SIDE ELEVATIONS | 22-05-23 | 0419-SEW-HPS-ZZ-DR-A-000036 Rev. P1 Existing South Elevation - HPS | ||
| EXISTING REAR ELEVATIONS | 22-05-23 | 0419-SEW-HPC-ZZ-DR-A-000033 Rev. P1 Existing West Elevation - HPC | ||
| EXISTING REAR ELEVATIONS | 22-05-23 | 0419-SEW-HPS-ZZ-DR-A-000037 Rev. P1 Existing West Elevation - HPS | ||
| EXISTING ROOF PLANS | 22-05-23 | 0419-SEW-HPC-03-DR-A-000014 Rev. P1 Existing Roof Plan - HPC | ||
| EXISTING ROOF PLANS | 22-05-23 | 0419-SEW-HPC-B1-DR-A-000010 Rev. P1 Existing Basement Floor Plan - HPC | ||
| EXISTING SECTIONS | 22-05-23 | 0419-SEW-HPC-ZZ-DR-A-000020 Rev. P1 Existing W/E Section - HPC | ||
| EXISTING SECTIONS | 22-05-23 | 0419-SEW-HPC-ZZ-DR-A-000021 Rev. P1 Existing N/S Section - HPC | ||
| EXISTING SECTIONS | 22-05-23 | 0419-SEW-HPS-ZZ-DR-A-000022 Rev. P1 Existing W/E Section - HPS | ||
| EXISTING SECTIONS | 22-05-23 | 0419-SEW-HPS-ZZ-DR-A-000023 Rev. P1 Existing N/S Section - HPS | ||
| PROPOSED FLOOR PLANS | 22-05-23 | 0419-SEW-HC-00-DR-A-001111 Rev. P1 Proposed Level 00 - HPC SUPERSEDED | ||
| PROPOSED FLOOR PLANS | 22-05-23 | 0419-SEW-HC-01-DR-A-001112 Rev. P1 Proposed Level 01 - HPC SUPERSEDED | ||
| PROPOSED FLOOR PLANS | 22-05-23 | 0419-SEW-HC-02-DR-A-001113 Rev. P1 Proposed Level 02 - HPC SUPERSEDED | ||
| PROPOSED FLOOR PLANS | 22-05-23 | 0419-SEW-HC-B1-DR-A-001110 Rev. P1 Proposed Basement Plan - HPC | ||
| PROPOSED FLOOR PLANS | 22-05-23 | 0419-SEW-HS-00-DR-A-001116 Rev. P1 Proposed Level 00 - HPS SUPERSEDED | ||
| PROPOSED FLOOR PLANS | 22-05-23 | 0419-SEW-HS-01-DR-A-001117 Rev. P1 Proposed Level 01 - HPS SUPERSEDED | ||
| PROPOSED FLOOR PLANS | 22-05-23 | 0419-SEW-HS-02-DR-A-001118 Rev. P1 Proposed Level 02 - HPS SUPERSEDED | ||
| PROPOSED ELEVATIONS | 22-05-23 | 0419-SEW-HC-ZZ-DR-A-001200 Rev. P1 Proposed North Courtyard Elevation - HPC | ||
| PROPOSED ELEVATIONS | 22-05-23 | 0419-SEW-HC-ZZ-DR-A-001201 Rev. P1 Proposed East Courtyard Elevation - HPC | ||
| PROPOSED ELEVATIONS | 22-05-23 | 0419-SEW-HC-ZZ-DR-A-001301 Rev. P1 Proposed North Elevation - HPC | ||
| PROPOSED ELEVATIONS | 22-05-23 | 0419-SEW-HS-ZZ-DR-A-001204 Rev. P1 Proposed North Courtyard Elevation - HPS | ||
| PROPOSED ELEVATIONS | 22-05-23 | 0419-SEW-HS-ZZ-DR-A-001205 Rev. P1 Proposed East Courtyard Elevation - HPS | ||
| PROPOSED ELEVATIONS | 22-05-23 | 0419-SEW-HS-ZZ-DR-A-001206 Rev. P1 Proposed South Courtyard Elevation - HPS | ||
| PROPOSED ELEVATIONS | 22-05-23 | 0419-SEW-HS-ZZ-DR-A-001207 Rev. P1 Proposed West Courtyard Elevation - HPS | ||
| PROPOSED FRONT ELEVATIONS | 22-05-23 | 0419-SEW-HS-ZZ-DR-A-001306 Rev. P1 Proposed East Elevation - HPS | ||
| PROPOSED SIDE ELEVATIONS | 22-05-23 | 0419-SEW-HC-ZZ-DR-A-001302 Rev. P1 Proposed East Elevation - HPC | ||
| PROPOSED SIDE ELEVATIONS | 22-05-23 | 0419-SEW-HC-ZZ-DR-A-001303 Rev. P1 Proposed South Elevation - HPC | ||
| PROPOSED SIDE ELEVATIONS | 22-05-23 | 0419-SEW-HS-ZZ-DR-A-001305 Rev. P1 Proposed North Elevation - HPS | ||
| PROPOSED SIDE ELEVATIONS | 22-05-23 | 0419-SEW-HS-ZZ-DR-A-001307 Rev. P1 Proposed South Elevation - HPS | ||
| PROPOSED REAR ELEVATIONS | 22-05-23 | 0419-SEW-HC-ZZ-DR-A-001304 Rev. P1 Proposed West Elevation - HPC | ||
| PROPOSED REAR ELEVATIONS | 22-05-23 | 0419-SEW-HS-ZZ-DR-A-001308 Rev. P1 Proposed West Elevation - HPS | ||
| PROPOSED ROOF PLANS | 22-05-23 | 0419-SEW-HC-RF-DR-A-001114 Rev. P1 Proposed Roof Plan - HPC | ||
| PROPOSED ROOF PLANS | 22-05-23 | 0419-SEW-HS-RF-DR-A-001119 Rev. P1 Proposed Roof Plan - HPS | ||
| PLAN | 22-05-23 | 0419-SEW-HC-00-DR-A-253200 Rev. P1 Proposed Elevational Detail Exterior View - HPC Entry | ||
| PLAN | 22-05-23 | 0419-SEW-HC-00-DR-A-253205 Rev. P1 Proposed Elevational detail bay Exterior Ground - HPC & HPS | ||
| PLAN | 22-05-23 | 0419-SEW-HC-01-DR-A-253210 Rev. P1 Proposed Elevational Detail Exterior View - HPC Courtyard | ||
| PLAN | 22-05-23 | 0419-SEW-HC-01-DR-A-253215 Rev. P1 Proposed Elevational detail bay Exterior View 1 - HPC & HPS SUPERSEDED | ||
| PLAN | 22-05-23 | 0419-SEW-HC-01-DR-A-253216 Rev. P1 Proposed Elevational detail bay Exterior View 2 - HPC & HPS SUPERSEDED | ||
| PLAN | 22-05-23 | 0419-SEW-HC-01-DR-A-253217 Rev. P1 Proposed Elevational Detail Bay Exterior View 3 - HPC & HPS | ||
| PLAN | 22-05-23 | 0419-SEW-HC-ZZ-DR-A-001202 Rev. P1 Proposed South Courtyard Elevation - HPC | ||
| PLAN | 22-05-23 | 0419-SEW-HC-ZZ-DR-A-001203 Rev. P1 Proposed West Courtyard Elevation - HPC | ||
| PLAN | 22-05-23 | 0419-SEW-HS-00-DR-A-253220 Rev. P1 Proposed Elevational Detail Exterior View - HPS Entry | ||
| PLAN | 22-05-23 | 0419-SEW-HS-00-DR-A-253225 Rev. P1 Proposed Elevational Detail Exterior View - HPS Courtyard SUPERSEDED | ||
| PLAN | 22-05-23 | 0419-SEW-ZZ-ZZ-DR-A-253230 Rev. P1 Proposed Details Balustrade & Roof Edge - HPC & HPS | ||
| PLAN | 22-05-23 | 0419-SEW-ZZ-ZZ-DR-L-001100 Rev. P1 Landscape Sections | ||
| PLAN AMENDED | 20-06-23 | 0419-SEW-ZZ-00-DR-L-001000 Rev. P1 Landscape Masterplan SUPERSEDED | ||
| PLAN AMENDED | 20-06-23 | 0419-SEW-ZZ-00-DR-L-001001 Rev. P1 Landscape Plan - Central Building SUPERSEDED | ||
| PLAN AMENDED | 20-06-23 | 0419-SEW-ZZ-00-DR-L-001002 Rev. P1 Landscape Plan - South Building SUPERSEDED | ||
| PLAN AMENDED | 20-06-23 | 0419-SEW-ZZ-00-DR-L-001004 Rev. P1 Landscape Masterplan w/ Site Boundary SUPERSEDED | ||
| PLAN AMENDED | 20-06-23 | 0419-SEW-ZZ-ZZ-DR-L-001003 Rev. P1 Soft Landscape Character Plan SUPERSEDED | ||
| PLAN AMENDED | 05-07-23 | 0419-SEW-HC-00-DR-A-001111 Rev. P2 Proposed Level 00 - HPC SUPERSEDED | ||
| PLAN AMENDED | 05-07-23 | 0419-SEW-HC-01-DR-A-001112 Rev. P2 Proposed Level 01 - HPC SUPERSEDED | ||
| PLAN AMENDED | 05-07-23 | 0419-SEW-HC-02-DR-A-001113 Rev. P2 Proposed Level 02 - HPC SUPERSEDED | ||
| PLAN AMENDED | 05-07-23 | 0419-SEW-HS-00-DR-A-001116 Rev. P2 Proposed Level 00 - HPS SUPERSEDED | ||
| PLAN AMENDED | 05-07-23 | 0419-SEW-HS-01-DR-A-001117 Rev. P2 Proposed Level 01 - HPS SUPERSEDED | ||
| PLAN AMENDED | 05-07-23 | 0419-SEW-HS-02-DR-A-001118 Rev. P2 Proposed Level 02 - HPS SUPERSEDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-HC-00-DR-A-001111 Rev. P3 Proposed Level 00 - HPC AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-HC-01-DR-A-001112 Rev. P3 Proposed Level 01 - HPC AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-HC-01-DR-A-253215 Rev. P2 Proposed Elevational Detail Bay Exterior View 1 - HPC & HPS AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-HC-01-DR-A-253216 Rev. P2 Proposed Elevational Detail Bay Exterior View 2 - HPC & HPS | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-HC-02-DR-A-001113 Rev. P3 Proposed Level 02 - HPC AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-HS-00-DR-A-001116 Rev. P3 Proposed Level 00 - HPS AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-HS-00-DR-A-253225 Rev. P2 Proposed Elevational Detail Exterior View - HPS Courtyard AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-HS-01-DR-A-001117 Rev. P3 Proposed Level 01 - HPS AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-HS-02-DR-A-001118 Rev. P3 Proposed Level 02 - HPS AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-ZZ-00-DR-L-001000 Rev. P2 Landscape Masterplan AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-ZZ-00-DR-L-001001 Rev. P2 Landscape Plan - Central Building AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-ZZ-00-DR-L-001002 Rev. P2 Landscape Plan - South Building AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-ZZ-00-DR-L-001003 Rev. P2 Soft Landscape Character Plan AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-ZZ-00-DR-L-001004 Rev. P2 Landscape Masterplan w/Site Boundary AMENDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-ZZ-00-DR-L-001005 Rev. P1 Building Interface Sections - HPC SUPERSEDED | ||
| PLAN AMENDED | 03-10-23 | 0419-SEW-ZZ-00-DR-L-001006 Rev. P1 Building Interface Sections - HPS SUPERSEDED | ||
| PLAN AMENDED | 08-12-23 | 0419-SEW-ZZ-00-DR-L-001005 Rev. P2 Building Interface Sections - HPC AMENDED | ||
| PLAN AMENDED | 08-12-23 | 0419-SEW-ZZ-00-DR-L-001006 Rev. P2 Building Interface Sections - HPS AMENDED |
Supporting Documentation
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 1) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 10 to 11) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 2) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 3 and 4) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 5 and 6) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 7-1) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 7-2) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 8-1) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 8-2) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 9-1) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 20-06-23 | Design and Access Statement (Dated May 2023) (Chapter 9-2) AMENDED | ||
| DESIGN AND ACCESS STATEMENT | 21-07-23 | Design and Access Statement (Full Version) (Submitted 19th July 2023) | ||
| SUPPORTING INFORMATION | 22-05-23 | Drawing Issue Sheet | ||
| SUPPORTING INFORMATION | 22-05-23 | Area Schedule Rev. P1 (Dated 12th May 2023) | ||
| SUPPORTING INFORMATION | 22-05-23 | Statement Of Community Engagement (Dated May 2023) | ||
| SUPPORTING INFORMATION | 22-05-23 | Circular Economy Statement GLA Spreadsheet SUPERSEDED | ||
| SUPPORTING INFORMATION | 22-05-23 | Whole Life Carbon Assessment GLA Spreadsheet SUPERSEDED | ||
| SUPPORTING INFORMATION | 22-05-23 | P0308EXT001 Rev. A Preliminary External Lighting and Assessment SUPERSEDED | ||
| SUPPORTING INFORMATION | 22-05-23 | P308SK001 Preliminary External Lighting Overview | ||
| SUPPORTING INFORMATION | 22-05-23 | Circular Economy Statement (Dated May 2023) (Erroneously titled as Whole Life Carbon Cycle Assessment) | ||
| SUPPORTING INFORMATION | 22-05-23 | Utilities Statement (Dated May 2023) | ||
| SUPPORTING INFORMATION | 20-06-23 | Financial Viability Assessment (Dated May 2023) AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | Planning Statement (Dated May 2023) AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | Daylight and Sunlight Report (Dated May 2023) (Part 1) AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | Daylight and Sunlight Report (Dated May 2023) (Part 2) AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | P0308EXT001 Rev. B Preliminary External Lighting and Assessment AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | Fire Statement (Dated May 2023) AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | Vibration Assessment (Dated May 2023) AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | Strategic Economic Case Report (Dated May 2023) AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | Housing Mix Report (Dated May 2023) AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | Refuse and Recycling Strategy (Dated May 2023) AMENDED | ||
| SUPPORTING INFORMATION | 20-06-23 | Site Waste Management Plan (Dated May 2023) AMENDED | ||
| SUPPORTING INFORMATION | 03-10-23 | Planning, LSH, HE, & GLA Responses Rev. 1 (Dated 22nd September 2023) | ||
| SUPPORTING INFORMATION | 03-10-23 | Drawing Issue Sheet September Submission | ||
| SUPPORTING INFORMATION | 03-10-23 | 157-60 Glazing Investigation (Dated January 2023) | ||
| SUPPORTING INFORMATION | 03-10-23 | Whole Life Carbon Assessment GLA Spreadsheet (Dated July 2023) AMENDED | ||
| SUPPORTING INFORMATION | 03-10-23 | Circular Economy Statement GLA Spreadsheet (Dated July 2023) AMENDED | ||
| SUPPORTING INFORMATION | 03-10-23 | Response to Consultation Feedback (Dated 29th September 2023) | ||
| SUPPORTING INFORMATION | 03-10-23 | Qualitative Design Review (Dated 5th September 2023) | ||
| SUPPORTING INFORMATION | 03-10-23 | Circular Economy Statement GLA Spreadsheet AMENDED | ||
| SUPPORTING INFORMATION | 03-10-23 | Whole Life Carbon Assessment GLA Spreadsheet AMENDED | ||
| SUPPORTING INFORMATION | 03-10-23 | Pre-Refurbishment Audit (Dated March 2023) | ||
| SUPPORTING INFORMATION | 03-10-23 | Circular Economy Workshop (Dated 31st January 2023) | ||
| SUPPORTING INFORMATION | 30-10-23 | Response to BNPPRE Viability Review and GLA Respon (Dated 20th October 2023) | ||
| SUPPORTING INFORMATION | 07-11-23 | BNP Paribas Comments Viability (Dated 2nd November 2023) | ||
| SUPPORTING INFORMATION | 08-12-23 | Planning Responses (Dated 21st November 2023) | ||
| SUPPORTING INFORMATION | 08-12-23 | Drawing Issue Sheet | ||
| SUPPORTING INFORMATION | 17-01-24 | Optimum Viable Use Memo (Dated 18th October 2022) | ||
| SUPPORTING INFORMATION | 23-01-24 | Letter Dated 24th January 2024 Without Prejudice Affordable Housing Offer (10% Shared Ownership) | ||
| SUPPORTING INFORMATION | 11-03-24 | Affordable Homes Plan (Submitted 11th March 2024) | ||
| SUPPORTING INFORMATION | 18-06-24 | Agreed Breakeven Appraisal (To be appended to S106 legal agreement) | ||
| ADVERTISEMENT NOTICE | 06-07-23 | Advert in Gazette 5.7.23 | ||
| TREE/LANDSCAPING REPORT | 22-05-23 | 1854-KC-XX-YTREE-TCP01 Rev. 0 Tree Constraints Plan | ||
| ENERGY REPORT | 22-05-23 | GLA Carbon Emission Reporting Spreadsheet | ||
| SUSTAINABILITY REPORT | 22-05-23 | Sustainability Statement (Dated May 2023) | ||
| ENERGY REPORT | 22-05-23 | Whole Life Carbon Assessment (Dated May 2023) | ||
| TREE/LANDSCAPING REPORT | 20-06-23 | 1854-KC-XX-YTREE-TPP01 Rev. 0 Tree Protection Plan AMENDED | ||
| TREE/LANDSCAPING REPORT | 20-06-23 | Arboriculture Impact Assessment (Dated May 2023) AMENDED | ||
| CULTURAL AND HERITAGE ASSESSMENT | 20-06-23 | Heritage and Visual Impact Assessment (Dated May 2023) AMENDED | ||
| ECOLOGY REPORT | 20-06-23 | Bat Survey Report (Dated May 2023) AMENDED | ||
| ECOLOGY REPORT | 20-06-23 | Biodiversity Impact Assessment (Dated May 2023) AMENDED | ||
| TRANSPORT ASSESSMENT | 20-06-23 | Outline Construction Logistics Plan (Dated May 2023) AMENDED | ||
| TRANSPORT ASSESSMENT | 20-06-23 | Delivery and Servicing Plan (Dated May 2023) AMENDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 20-06-23 | Drainage Assessment and Strategy Report (Dated May 2023) (Part 1) SUPERSEDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 20-06-23 | Drainage Assessment and Strategy Report (Dated May 2023) (Part 2) SUPERSEDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 20-06-23 | Flood Risk Assessment (Dated May 2023) (Part 1) SUPERSEDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 20-06-23 | Flood Risk Assessment (Dated May 2023) (Part 2) SUPERSEDED | ||
| AIR QUALITY REPORT | 20-06-23 | Air Quality Assessment (Dated May 2023) SUPERSEDED | ||
| SUSTAINABILITY REPORT | 20-06-23 | Overheating Assessment (Dated May 2023) AMENDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 20-06-23 | P450887-WW-XX-RF-DR-C-1001 Rev. P2 Proposed Drainage Layout SUPERSEDED | ||
| LAND ASSESSMENT | 20-06-23 | Phase 1 Environmental Report (Dated May 2023) AMENDED | ||
| ECOLOGY REPORT | 20-06-23 | Preliminary Ecological Appraisal (Dated May 2023) AMENDED | ||
| ENERGY REPORT | 20-06-23 | Energy Strategy Refurbished Residential (Dated May 2023) AMENDED | ||
| ENERGY REPORT | 20-06-23 | Energy Strategy Operational Energy Analysis (Dated May 2023) AMENDED | ||
| TRANSPORT ASSESSMENT | 20-06-23 | Transport Assessment (Dated May 2023) AMENDED | ||
| TRANSPORT ASSESSMENT | 20-06-23 | Framework Travel Plan (Dated May 2023) AMENDED | ||
| AIR QUALITY REPORT | 03-10-23 | PP2012/HP/AQDMP/202309-EC Air Quality and Dust Management Plan (Dated September 2023) AMENDED | ||
| AIR QUALITY REPORT | 03-10-23 | PP2012/HP/AQA/202309-EC Air Quality Assessment (Dated September 2023) AMENDED | ||
| ENERGY REPORT | 03-10-23 | GLA Carbon Emission Reporting Spreadsheet AMENDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 03-10-23 | P450887-WW-XX-RF-DR-C-1001 Rev. P4 Proposed Drainage Layout AMENDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 03-10-23 | P450887-WW-XX-RF-DR-C-1003 Rev. P1 Exceedance Plan AMENDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 03-10-23 | P450887-WW-XX-XX-RP-C-0001 Rev. P4 Flood Risk Assessment (Dated September 2023) AMENDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 03-10-23 | P450887-WW-XX-XX-RP-C-0002 Rev. P5 Drainage Assessment and Strategy Report (Dated September 2023) SUPERSEDED | ||
| FLOOD AND DRAINAGE ASSESSMENT | 03-10-23 | P450887-WW-XX-FN-C-0002 Rev. P1 Response to LLFA planning Objections (Dated 27th September 2023) | ||
| FLOOD AND DRAINAGE ASSESSMENT | 03-10-23 | P450887-WW-XX-FN-C-0003 Rev. P1 Response to GLA planning Objections (Dated 29th September 2023) | ||
| TRANSPORT ASSESSMENT | 03-10-23 | WIE19060.112.R.1.1.3.TN Transport Note - Response to GLA and Highway Authority (Dated September 2023) | ||
| FLOOD AND DRAINAGE ASSESSMENT | 21-11-23 | P450887-WW-XX-XX-RP-C-0002 Rev. P5 Drainage Assessment and Strategy Report (Dated 15th November 2023) AMENDED |
Decision Documentation
| DECISION NOTICE | 15-08-24 | |||
| OFFICERS REPORTS | 15-08-24 | |||
| SECTION 106 AGREEMENT | 09-08-24 | Completed 9th August 2024 |