DOCUMENTS

Application Forms
APPLICATION FORM 11-08-25 ApplicationFormRedacted Application Form - Without Personal Data

Plans
LOCATION PLAN 11-08-25 A_001 The location plan
BLOCK PLAN 11-08-25 A_002 Proposed Block Plan
EXISTING FLOOR PLANS 11-08-25 A100 Existing Lower Ground Floor Plan
EXISTING FLOOR PLANS 11-08-25 A101 Existing Ground Floor Plan
EXISTING FLOOR PLANS 11-08-25 A102 Existing 1st Floor Plan
EXISTING FLOOR PLANS 11-08-25 A103 Existing 2nd Floor Plan
EXISTING FLOOR PLANS 11-08-25 A104 Existing Third floor Plan
EXISTING PLAN AMENDED 16-09-25 A300 - As built Lower Ground Floor Plan
EXISTING PLAN AMENDED 16-09-25 A301 - As built Ground Floor Plan
EXISTING PLAN AMENDED 16-09-25 A302 - As built 1st Floor Plan
EXISTING PLAN AMENDED 16-09-25 A303 - As built 2nd Floor Plan
EXISTING PLAN AMENDED 16-09-25 A304 - As built Third floor Plan
NOISE ASSESSMENT 11-08-25 Noise Impact Assessment Document Reference: BD/CS/P25-3550/02 Rev A, August 2025, Create
NOISE ASSESSMENT 11-08-25 Noise Technical Note, August 2025, File Ref: BD/CS/P25-3550/03TN, Create
EXISTING ELEVATIONS 11-08-25 A110 Existing street elevations
EXISTING ELEVATIONS 11-08-25 A111 Existing south elevations
EXISTING ELEVATIONS 11-08-25 A112 Existing west elevations
EXISTING ELEVATIONS 11-08-25 A113 Existing north elevations
EXISTING ELEVATIONS 11-08-25 A114 Existing east elevations
EXISTING ROOF PLANS 11-08-25 A105 Existing Roof plan
EXISTING SECTIONS 11-08-25 A120 Existing Section AA
EXISTING SECTIONS 11-08-25 A121 Existing section B
EXISTING SECTIONS 11-08-25 A122 Existing section CC
EXISTING SECTIONS 11-08-25 A123 Existing section DD
EXISTING SECTIONS 11-08-25 A124 Existing section EE
EXISTING SECTIONS 11-08-25 A125 Existing section FF
EXISTING SECTIONS 11-08-25 A126 Existing section GG
PROPOSED FLOOR PLANS 11-08-25 A200 Proposed Lower Ground Floor Plan
PROPOSED FLOOR PLANS 11-08-25 A201 Proposed Ground Floor Plan
PROPOSED FLOOR PLANS 11-08-25 A202 Proposed First Floor Plan
PROPOSED FLOOR PLANS 11-08-25 A203 Proposed Second Floor Plan
PROPOSED FLOOR PLANS 11-08-25 A204 Proposed Third Floor Plan
PROPOSED PLAN 16-09-25 A201 - Proposed Ground Floor Plan (Accessibility)
PROPOSED ELEVATIONS 11-08-25 A210 Proposed street elevations
PROPOSED ELEVATIONS 11-08-25 A211 Proposed south elevations
PROPOSED ELEVATIONS 11-08-25 A212 Proposed west elevations
PROPOSED ELEVATIONS 11-08-25 A213 Proposed north elevations
PROPOSED ELEVATIONS 11-08-25 A214 Proposed east elevations
PROPOSED ROOF PLANS 11-08-25 A205 Proposed roof plan
PROPOSED SECTIONS 11-08-25 A220 Proposed Section AA
PROPOSED SECTIONS 11-08-25 A221 Proposed Section BB
PROPOSED SECTIONS 11-08-25 A222 Proposed Section CC
PROPOSED SECTIONS 11-08-25 A223 Proposed Section DD
PROPOSED SECTIONS 11-08-25 A224 Proposed Section EE
PROPOSED SECTIONS 11-08-25 A225 Proposed Section FF
PROPOSED SECTIONS 11-08-25 A226 Proposed Section GG

Supporting Documentation
DESIGN AND ACCESS STATEMENT 11-08-25 Design and access statement, June 2025, Nick Willson Architects
SUPPORTING INFORMATION 11-08-25 Construction and Demolition Method Statement
SUPPORTING INFORMATION 11-08-25 Daylight and sunlight assessment, 28 July 2025, C1281/DS, Chancery Group
SUPPORTING INFORMATION 11-08-25 Planning statement, August 2025, Sphere25
SUPPORTING INFORMATION 11-08-25 Fire Statement, 28th July 2025, Rockland Safety Services Ltd
SUPPORTING INFORMATION 11-08-25 Structural Impact Assessment Letter, 11/07/2025, Urban Consulting Engineers
SUPPORTING INFORMATION 11-08-25 Odour Assessment, August 2025, Create Consulting Engineers
SUPPORTING INFORMATION 16-09-25 Watching brief report, November 2024, Nick Willson Architects
SUPPORTING INFORMATION 16-09-25 Watching brief report - Mezzanine areas,January 2025, Nick Willson Architects
SUPPORTING INFORMATION 16-09-25 Historic Fibrous Plaster Inspection & Conservation Methodology, 19/12/24, Locker & Riley (Heritage)
ADVERTISEMENT NOTICE 30-10-25
ECOLOGY REPORT 11-08-25 Preliminary Ecological Appraisal, Ref: 451627 / SJ1, 15/01/25, Gradwell Group
ENERGY REPORT 11-08-25 Energy and Sustainability Statement - Appendix A
ENERGY REPORT 11-08-25 Energy and Sustainability Statement - Appendix B
ENERGY REPORT 11-08-25 Energy and Sustainability Statement - Appendix C
ENERGY REPORT 11-08-25 Energy and Sustainability Statement - Appendix D
ENERGY REPORT 11-08-25 Energy & Sustainability Statement, 23rd June 2025, The PES
LAND ASSESSMENT 11-08-25 Land contamination assessment, Landmark Information
FLOOD AND DRAINAGE ASSESSMENT 11-08-25 Flood Risk Assessment and SuDS Report, June 2025, Nimbus Engineering Consultants
CULTURAL AND HERITAGE ASSESSMENT 11-08-25 Heritage statement, July 2025 Fuller Long
FLOOD AND DRAINAGE ASSESSMENT 11-08-25 The London Sustainable Drainage Proforma
FLOOD AND DRAINAGE ASSESSMENT 11-08-25 Sequential Test Report, June 2025, Nimbus Engineering Consultants
AIR QUALITY REPORT 11-08-25 Air Quality Assessment, Ref: TR/CS/P25-3550/01, August 2025, Create Consulting Engineers
TRANSPORT ASSESSMENT 11-08-25 SUPERSEDED SUPERSEDED Transport Statement, 22nd July 2025, RKS Associates
FLOOD AND DRAINAGE ASSESSMENT 11-08-25 Water Efficiency Calculations Report, June 2025, Nimbus Engineering Consultants
TRANSPORT ASSESSMENT 16-09-25 Transport Statement, September 2025, RKS Associates
TRANSPORT ASSESSMENT 16-09-25 Travel Plan, September 2025, RKS Associates

Decision Documentation
There are no documents for this section