DOCUMENTS

Application Forms
APPLICATION FORM 25-09-25 Application Form - Without Personal Data

Plans
LOCATION PLAN 25-09-25 7935 - SMR - 00 - ZZ - DR - A - 2001 - S3 -P4 SITE LOCATION PLAN
BLOCK PLAN 25-09-25 7935 - SMR - 00 - ZZ - DR - A - 2002 - S3 - P5 EXISTING SITE PLAN
BLOCK PLAN 25-09-25 SUPERSEDED SUPERSEDED PROPOSED SITE PLAN - PHASE 1
SITE LAYOUT - PROPOSED 25-09-25 SUPERSEDED SUPERSEDED ILLUSTRATIVE PROPOSED SITE PLAN - PHASE 2
SITE LAYOUT - LANDSCAPING 25-09-25 SUPERSEDED SUPERSEDED PHASE 1 - LANDSCAPE PLAN
SITE LAYOUT - LANDSCAPING 25-09-25 0586-WSP-XX-XX-DR-L-1011 P02 PHASE 1 - LANDSCAPE DETAILS SHEET 01 OF 02
SITE LAYOUT - LANDSCAPING 25-09-25 0586-WSP-XX-XX-DR-L-1012 P02 PHASE 1 - LANDSCAPE DETAILS SHEET 02 OF 02
SITE LAYOUT - DRAINAGE 25-09-25 242120-ECE-ZZ-XX-DR-C-5211 P5 Proposed Drainage Layout Phase 1
SITE LAYOUT - SITE LEVELS 25-09-25 242120-ECE-ZZ-XX-DR-C-9001 P4 PROPOSED LEVELS PHASE 1
NOISE ASSESSMENT 25-09-25 Noise Impact Assessment Noise Impact Assessment, September 2025, Tetra Tech
PROPOSED PLAN 25-09-25 SUPERSEDED SUPERSEDED PROPOSED BOUNDARY TREATMENT & DETAILS
PROPOSED PLAN 25-09-25 SUPERSEDED SUPERSEDED SOLAR CANOPY DETAILS
PROPOSED PLAN 25-09-25 SUPERSEDED SUPERSEDED HEIGHT RESTRICTORS, CYCLE AND SMOKING SHELTER DETAILS
PROPOSED PLAN 25-09-25 SUPERSEDED SUPERSEDED PROPOSED SURFACE FINISHES - PHASE 1
PROPOSED PLAN 25-09-25 SUPERSEDED SUPERSEDED SUBSTATION DETAILS
PROPOSED PLAN 25-09-25 SUPERSEDED SUPERSEDED FEEDER PILLAR DETAILS
PROPOSED PLAN 25-09-25 SUPERSEDED SUPERSEDED FOOD AND BEVERAGE GA FLOOR PLAN
PROPOSED PLAN 25-09-25 7935 - SMR - 02 - ZZ - DR - A - 2103 - S3 - P3 STAFF BLOCK GA PLANS & ELEVATIONS
PROPOSED PLAN 25-09-25 7935 - SMR - 03 - ZZ - DR - A - 2104 - S3 -P4 WELFARE BLOCK GA FLOOR PLANS
PROPOSED PLAN AMENDED 24-12-25 SUPERSEDED 0586-WSP-XX-XX-DR-L-1001 P06 SUPERSEDED PHASE 1 - LANDSCAPE PLAN (revised)
PROPOSED PLAN AMENDED 24-12-25 SUPERSEDED 7935-SMR-00-ZZ-DR-A-2003-S3-P15 SUPERSEDED PROPOSED SITE PLAN - PHASE 1 (revised)
PROPOSED PLAN AMENDED 24-12-25 SUPERSEDED 7935-SMR-00-ZZ-DR-A-2004-S3-P17 SUPERSEDED PROPOSED SITE PLAN - PHASE 2 (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-00-ZZ-DR-A-2005-S3-P6 SITE SECTIONS (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-00-ZZ-DR-A-2006-S3-P8 PROPOSED BOUNDARY TREATMENT & DETAILS (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-00-ZZ-DR-A-2007-S3-P6 SOLAR CANOPY DETAILS (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-00-ZZ-DR-A-2008-S3-P6 HEIGHT RESTRICTORS, CYCLE AND SMOKING SHELTER DETAILS (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-00-ZZ-DR-A-2009-S3-P7 PROPOSED SURFACE FINISHES - PHASE 1 (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-00-ZZ-DR-A-2010-S3-P7 PROPOSED SURFACE FINISHES - PHASE 2 (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-00-ZZ-DR-A-2011-S2-P3 SUBSTATION DETAILS (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-00-ZZ-DR-A-2012-S2-P4 FEEDER PILLAR DETAILS (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-00-ZZ-DR-A-2013-S2-P1 POWER UNIT DETAILS (revised)
PROPOSED PLAN AMENDED 24-12-25 7935-SMR-01-ZZ-DR-A-2101-S3-P4 FOOD AND BEVERAGE GA FLOOR PLAN (revised)
PROPOSED PLAN 24-12-25 W.003850-RED-XX-XX-DR-M-2010 T1 Co-ordinated Services Auxiliary Buildings Layout
PROPOSED PLAN 24-12-25 W.003850-RED-XX-XX-DR-Z-2000 T1 Co-ordinated Services External MEP Services
PROPOSED PLAN AMENDED 03-02-26 7935 - SMR - 00 - ZZ - DR - A - 2003 - S3 - P17 Proposed Site Plan - Phase 1
PROPOSED PLAN AMENDED 03-02-26 7935 - SMR - 00 - ZZ - DR - A - 2004 - S3 - P19 Proposed Site Plan - Phase 2
PROPOSED PLAN AMENDED 03-02-26 7935 - SMR - 00 - ZZ - DR - A - 2014 - S3 -P2 Site Phasing Plan
PROPOSED PLAN AMENDED 03-02-26 0586-WSP-XX-XX-DR-L-1001 P07 Phase 1 - Landscape Plan
PROPOSED ELEVATIONS 25-09-25 7935 - SMR - 01 - ZZ - DR - A - 2102 - S3 - P4 FOOD AND BEVERAGE PROPOSED ELEVATIONS
PROPOSED ELEVATIONS 25-09-25 7935 - SMR - 03 - ZZ - DR - A - 2105 - S3 - P3 WELFARE BLOCK PROPOSED ELEVATIONS
PROPOSED SECTIONS 25-09-25 SUPERSEDED SUPERSEDED SITE SECTIONS

Supporting Documentation
DESIGN AND ACCESS STATEMENT 25-09-25 Design and access statement Design and Access Statement, REV P05 08/09/2025, SMR Architects
SUPPORTING INFORMATION 25-09-25 Design and Construction Method Statement Design and Construction Method Statement, 10/09/25, Kam Project Consultants
SUPPORTING INFORMATION 25-09-25 W.003850-RED-XX-XX-DR-E-2300 P3 ELECTRIC SERVICES EXTERNAL LIGHTING LAYOUT
SUPPORTING INFORMATION 25-09-25 Fire Statement Planning Fire Safety Statement, Rev. 2, 17/06/25, Socotec UK
SUPPORTING INFORMATION 25-09-25 Operator Statement Operator Statement, Lysara
SUPPORTING INFORMATION 25-09-25 Outline Application Form Other relevant information
SUPPORTING INFORMATION 25-09-25 Planning statement Planning statement, September 2025, Quod
SUPPORTING INFORMATION 25-09-25 Refuse Management Strategy Refuse Management Strategy, Rev. V3, September 2025, Tetra Tech
SUPPORTING INFORMATION 25-09-25 Solar Glare Assessment Part 1 Solar Glare Assessment, 06 June 2025, Hollis
SUPPORTING INFORMATION 25-09-25 Solar Glare Assessment Part 2 Solar Glare Assessment, 06 June 2025, Hollis
SUPPORTING INFORMATION 25-09-25 Solar Glare Assessment Part 3 Solar Glare Assessment, 06 June 2025, Hollis
SUPPORTING INFORMATION 25-09-25 Computer Generated Image - Aerial
SUPPORTING INFORMATION 25-09-25 Computer Generated Image - View 1
SUPPORTING INFORMATION 25-09-25 Computer Generated Image - View 2
SUPPORTING INFORMATION 25-09-25 Computer Generated Image - View 3
SUPPORTING INFORMATION 25-09-25 Computer Generated Image - View 4
SUPPORTING INFORMATION 04-02-26 ILHEATH-MB-S278-XX-DR-D-0001 P6 PROPOSED S278 HIGHWAY WORKS DETAILED ENGINEERING LAYOUT
TRANSPORT ASSESSMENT 25-09-25 Active Travel Zone Assessment, 12th March 2025, Mayer Brown
AIR QUALITY REPORT 25-09-25 Air Quality Assessment Air Quality Assessment, Ref: 784-B070271, 8th September 2025, Tetra Tech
TREE/LANDSCAPING REPORT 25-09-25 Arboricultural Impact Assessment. Arboricultural Impact Assessment, Ref. 2024UK337123-ARB-AIA-001, Rev. 2, 30 July 2025, WSP
CULTURAL AND HERITAGE ASSESSMENT 25-09-25 Archaeological assessment Archaeological assessment, 11 August 2025, RPS Group
FLOOD AND DRAINAGE ASSESSMENT 25-09-25 Sustainable Drainage Strategy, Rev. P3, 08.08.25, EirEng
ENERGY REPORT 25-09-25 Energy Statement Energy Statement Rev. R002, 18/06/2025, RED
FLOOD AND DRAINAGE ASSESSMENT 25-09-25 Flood Risk Assessment Flood Risk Assessment, Rev. P4, 08/09/25, EirEng
LAND ASSESSMENT 25-09-25 Part 1 of 2 Phase 1 Geo-environmental Assessment Desk Top Study, V1 - Final, June 2025, Tetra Tech
LAND ASSESSMENT 25-09-25 Part 2 of 2 Phase 1 Geo-environmental Assessment Desk Top Study, V1 - Final, June 2025, Tetra Tech
ECOLOGY REPORT 25-09-25 Biodiversity survey and report Preliminary Ecological Appraisal Report, Ref. No. 001, September 2025, WSP
TRANSPORT ASSESSMENT 25-09-25 Stage 2 Road Safety Audit Stage 2 Road Safety Audit, Ref: 4436/026/A4/TLRN/2024, Rev. A, 11/07/2024, TfL Engineering
TRANSPORT ASSESSMENT 25-09-25 Transport Assessment Transport Assessment, 17th September 2025, Mayer Brown
TRANSPORT ASSESSMENT 25-09-25 Travel Plan Travel Plan Statement, 8th August 2025, Mayer Brown
TRANSPORT ASSESSMENT 18-11-25 Technical Note - TN02, 14th November 2025, Mayer Brown
ADDITIONAL DOCUMENTS 18-11-25 Response to Design and Landscape Comments, November 2025, Quod
AIR QUALITY REPORT 03-02-26 Air Quality Positive Statement, 784-B070271, 16th January 2026, Tetra Tech

Decision Documentation
There are no documents for this section