DOCUMENTS
Application Forms
| APPLICATION FORM | 16-10-20 | Application Form - Without Personal Data |
Plans
| LOCATION PLAN | 16-10-20 | SUPERSEDED Site Location Plan - UXB001-MPI-XX-XX-DR-A-010001 Rev P1 | ||
| BLOCK PLAN | 16-10-20 | SUPERSEDED Site Block Plan - Existing - UXB001-MPI-XX-XX-DR-A-010002 Rev P2 | ||
| BLOCK PLAN | 16-10-20 | SUPERSEDED Site Block Plan - Proposed - UXB001-MPI-ZZ-XX-DR-A-010004 Rev P1 | ||
| EXISTING PLAN | 16-10-20 | UXB001-MPI-XX-XX-DR-A-010100 Rev P1 Existing Building - Plans - | ||
| EXISTING PLAN | 16-10-20 | UXB001-MPI-XX-XX-DR-A-010200 Rev P1 Existing Building - Elevations | ||
| NOISE ASSESSMENT | 16-10-20 | Acoustic Planning Report dated Sept 2020 Acoustic Planning Report dated Sept 2020 | ||
| NOISE ASSESSMENT | 10-03-21 | Technical Addendum Noise dated March 2021 Technical Addendum Noise dated March 2021 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Typical Unit Layouts - GCS, GCR_1Bed & GCR_2Bed - UXB001-MPI-XX-XX-DR-A-300100 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Typical Unit Layouts - GLR_1Bed M4(3) & GLR_2Bed M4(3) - UXB001-MPI-XX-XX-DR-A-300101 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Typical Unit Layouts - GLR_1Bed & GLR_2Bed - UXB001-MPI-XX-XX-DR-A-300102 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Level 00 Master Plan - UXB001-MPI-ZZ-00-DR-A-200000 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Level 00 GA - UXB001-MPI-ZZ-00-DR-A-200100 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Level 01 Master Plan - UXB001-MPI-ZZ-01-DR-A-200001 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Level 02 Master Plan - UXB001-MPI-ZZ-01-DR-A-200002 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Level 03 Master Plan - UXB001-MPI-ZZ-01-DR-A-200003 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Level 04 Master Plan - UXB001-MPI-ZZ-01-DR-A-200004 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Level 05 Master Plan - UXB001-MPI-ZZ-01-DR-A-200005 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Level 06 Master Plan - UXB001-MPI-ZZ-01-DR-A-200006 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Level 07 Master Plan - UXB001-MPI-ZZ-01-DR-A-200007 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Roof Level Master Plan - UXB001-MPI-ZZ-01-DR-A-200010 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Level 01 GA - UXB001-MPI-ZZ-00-DR-A-200101 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Level 02 GA - UXB001-MPI-ZZ-01-DR-A-200102 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Level 03 GA - UXB001-MPI-ZZ-01-DR-A-200103 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Level 04 GA - UXB001-MPI-ZZ-01-DR-A-200104 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Level 05 GA - UXB001-MPI-ZZ-01-DR-A-200105 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Level 06 GA - UXB001-MPI-ZZ-01-DR-A-200106 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Level 07 GA - UXB001-MPI-ZZ-01-DR-A-200107 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Roof Level GA - UXB001-MPI-ZZ-01-DR-A-200110 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Substation & Generator Room - UXB001-MPI-ZZ-01-DR-A-200500 Rev P1 | ||
| PROPOSED PLAN | 16-10-20 | SUPERSEDED Mezzanine Level Master Plan - UXB001-MPI-ZZ-MZ-DR-A-200000_02 Rev P1 | ||
| PROPOSED FLOOR PLANS | 16-10-20 | SUPERSEDED Mezzanine Level GA - UXB001-MPI-ZZ-MZ-DR-A-200100_02 Rev P1 | ||
| PROPOSED ELEVATIONS | 16-10-20 | SUPERSEDED Elevations AA'/BB' - UXB001-MPI-XX-XX-DR-A-200200 Rev P1 | ||
| PROPOSED ELEVATIONS | 16-10-20 | SUPERSEDED Elevations CC'/DD' - UXB001-MPI-XX-XX-DR-A-200201 Rev P1 | ||
| PROPOSED ELEVATIONS | 16-10-20 | SUPERSEDED Elevations EE'/FF' - UXB001-MPI-XX-XX-DR-A-200202 Rev P1 | ||
| PROPOSED ELEVATIONS | 16-10-20 | SUPERSEDED Elevations GG'/HH' - UXB001-MPI-XX-XX-DR-A-20020 Rev P1 | ||
| PROPOSED ELEVATIONS | 16-10-20 | SUPERSEDED Elevations II'/JJ' - UXB001-MPI-XX-XX-DR-A-200204 Rev P1 | ||
| PROPOSED ELEVATIONS | 16-10-20 | SUPERSEDED Site - Elevations - UXB001-MPI-XX-XX-DR-A-200210 Rev P1 | ||
| PROPOSED SECTIONS | 16-10-20 | SUPERSEDED Sections Building A - UXB001-MPI-XX-XX-DR-A-200300 Rev P1 | ||
| PROPOSED SECTIONS | 16-10-20 | SUPERSEDED Sections Building B - UXB001-MPI-XX-XX-DR-A-200301 Rev P1 | ||
| PROPOSED SECTIONS | 16-10-20 | SUPERSEDED Sections Building A/B - UXB001-MPI-XX-XX-DR-A-200302 Rev P1 | ||
| PROPOSED SECTIONS | 16-10-20 | SUPERSEDED Site Sections - UXB001-MPI-XX-XX-DR-A-200303 Rev P1 | ||
| PLAN | 16-10-20 | SUPERSEDED Boundary and Levels Sheet 1 of 1 | ||
| DEMOLITION PLAN | 16-10-20 | SUPERSEDED Demolition Plan - UXB001-MPI-XX-XX-DR-A-100001 Rev P1 | ||
| DEMOLITION PLAN | 16-10-20 | SUPERSEDED Demolition - Elevations - UXB001-MPI-XX-XX-DR-A-100002 Rev P1 | ||
| PLAN | 16-10-20 | SUPERSEDED Typical Bay Study - Bay 1 - Building A -UXB001-MPI-XX-XX-DR-A-210300 Rev P1 | ||
| PLAN | 16-10-20 | SUPERSEDED Typical Bay Study - Bay 2 - Building A - UXB001-MPI-XX-XX-DR-A-210301 Rev P1 | ||
| PLAN | 16-10-20 | SUPERSEDED Typical Bay Study - Bay 3 - Building A - UXB001-MPI-XX-XX-DR-A-210302 Rev P1 | ||
| PLAN AMENDED | 29-12-20 | UXB001-200020 Rev. P1 DRAFT - Level 00 Masterplan | ||
| PLAN AMENDED | 02-03-21 | Care Funded Years Calculation Care Funded Years Calculation | ||
| PLAN AMENDED | 10-03-21 | 624_P_00_100 Rev. P11 Ground Floor Masterplan | ||
| PLAN AMENDED | 10-03-21 | 624_S_00_171 Rev. P01 Section: Boundary Interfaces Harefield Road | ||
| PLAN AMENDED | 10-03-21 | 624_S_00_210 Rev. P01 Ground Floor Section | ||
| PLAN AMENDED | 10-03-21 | 624-S-00-172 Rev. P01 Section Boundary Interfaces Access Road 2/4 | ||
| PLAN AMENDED | 10-03-21 | Flood Risk Assessment and Drainage Strategy Flood Risk Assessment and Drainage Strategy, dated March 2021 | ||
| PLAN AMENDED | 11-03-21 | S-00-174 Issue P02 Section: Boundary interfaces 4/4 Magistrates Garden | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-MR-A-000010 Rev. P2 CGI View 1 | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-MR-A-000011 Rev. P2 CGI View 2 | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-MR-A-000012 Rev. P2 CGI View 3 | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-MR-A-000013 Rev. P2 CGI View 4 | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-010001 Rev. P2 Site Location Plan | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-010002 Rev. P2 Site Block Plan - Existing | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-ZZ-XX-DR-A-010004 Rev. P2 Site Block Plan - Proposed | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-ZZ-XX-DR-A-010005 Rev. P1 Site Block Plan - Separation Distances | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-100001 Rev. P1 Demolition Plan | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-100002 Rev. P1 Demolition Elevations | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 00 Master Plan - UXB001-MPI-ZZ-00-DR-A-200000 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Mezzanine Level Master Plan - UXB001-MPI-ZZ-MZ-DR-A-200000_02 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 01 Master Plan UXB001-MPI-ZZ-01-DR-A-200001 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 02 Master Plan - UXB001-MPI-ZZ-02-DR-A-200002 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 03 Master Plan - UXB001-MPI-ZZ-03-DR-A-200003 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 04 Master Plan - UXB001-MPI-ZZ-04-DR-A-200004 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 05 Master Plan - UXB001-MPI-ZZ-05-DR-A-200005 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 06 Master Plan - UXB001-MPI-ZZ-06-DR-A-200006 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-ZZ-XX-DR-A-200010 Rev. P2 Roof Level Master Plan | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 00 General Arrangement - UXB001-MPI-ZZ-00-DR-A-200100 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Mezzanine Level Master Plan - UXB001-MPI-ZZ-MZ-DR-A-200000_02 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 01 GA - UXB001-MPI-ZZ-01-DR-A-200101 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 02 GA - UXB001-MPI-ZZ-02-DR-A-200102 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 03 GA - UXB001-MPI-ZZ-03-DR-A-200103 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 04 GA - UXB001-MPI-ZZ-04-DR-A-200104 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 05 GA - UXB001-MPI-ZZ-05-DR-A-200105 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Level 06 GA - UXB001-MPI-ZZ-06-DR-A-200106 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-ZZ-XX-DR-A-200110 Rev. P2 Roof Level | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Elevations AA/BB - UXB001-MPI-XX-XX-DR-A-200200 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-200201 Rev. P2 Elevation CC/DD | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-200202 Rev. P2 Elevations EE/FF | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-200203 Rev. P2 Elevations GG/HH | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-200204 Rev. P2 Elevations II/JJ | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-200210 Rev. P2 Site- Elevations | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-200300 Rev. P2 Sections Building A | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Section Building B - UXB001-MPI-XX-XX-DR-A-200301 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Sections Building A/B - UXB001-MPI-XX-XX-DR-A-200302 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-200303 Rev. P2 Site Sections | ||
| PLAN AMENDED | 11-03-21 | SUPERSEDED Substation and Generation Room - UXB001-MPI-XX-XX-DR-A-200500 Rev. P2 | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-210300 Rev. P2 Typical Bay Study - Bay 1 - Building A | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-210301 Rev. P2 Typical Bay Study - Bay 2 - Building A | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-210302 Rev. P2 Typical Bay Study - Bay 3 - Building A | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-300100 Rev. P2 Typical Unit Layouts - GCS, GCR 1bed | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-300101 Rev. P2 Typical Unit Layouts - GLR, 1 bed, GLR 1 Bed M4(3) | ||
| PLAN AMENDED | 11-03-21 | UXB001-MPI-XX-XX-DR-A-300102 Rev. P2 Typical Unit Layouts - GLR 2 Bed, GLR 2 Bed M4 (3) | ||
| PLAN AMENDED | 25-03-21 | SUPERSEDED Level 00 Master Plan - UXB001-MPI-ZZ-00-DR-A-200000 Rev. P3 | ||
| PLAN AMENDED | 25-03-21 | SUPERSEDED Level 00 GA - UXB001-MPI-ZZ-00-DR-A-200100 Rev. P3 | ||
| PLAN AMENDED | 25-03-21 | UXB001-MPI-ZZ-MZ-DR-A-200100_02 Rev. P3 Mezzanine Level GA | ||
| PLAN AMENDED | 04-05-21 | UXB001 - 200100 Rev. P6 Level 00 General Arrangement Plan | ||
| PLAN AMENDED | 10-05-21 | 624_P_00_100_1 Rev. P12 Ground Floor Master Plan | ||
| PLAN AMENDED | 10-05-21 | 624_P_02_102 Issue P04 Podium Garden | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200000 Rev. P4 Level 00 Master Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200000_02 Rev. P3 Mezzanine Level Master Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200001 Rev. P3 Level 01 Master Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200002 Rev. P3 Level 02 Master Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200003 Rev. P3 Level 03 Masterplan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200004 Rev. P3 Level 04 Master Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200005 Rev. P3 Level 05 Master Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200006 Rev. P3 Level 06 Master Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200010 Rev. P3 Roof Level Master Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200100 Rev. P6 Level 00 General Arrangement Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200100_02 Rev. P4 Mezzanine Level General Arrangement Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200101 Rev. P3 Level 01 General Arrangement Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200102 Rev. P3 Level 02 General Arrangement Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200103 Rev. P3 Level 03 General Arrangement Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200104 Rev. P3 Level 04 General Arrangement | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200105 Rev. P3 Level 05 General Arrangement Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200106 Rev. P3 Level 06 General Arrangement Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200110 Rev. P3 Roof Level Plan | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200200 Rev. P3 Proposed Elevations | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200301 Rev. P3 Proposed Section Building B | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200302 Rev. P3 Sections Building A-B | ||
| PLAN AMENDED | 10-05-21 | UXB001 - 200500 Rev. P3 Substation and Generator Room |
Supporting Documentation
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 1 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 10 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 11 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 2 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 3 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 4 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 5 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 6 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 7 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 8 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 9 Design & Access Statement | ||
| DESIGN AND ACCESS STATEMENT | 16-10-20 | September 2020 Rev P2 - Part 12 Design & Access Statement | ||
| SUPPORTING INFORMATION | 16-10-20 | 104182 04/09/2020 Version F1 Construction Logistics Plan | ||
| SUPPORTING INFORMATION | 16-10-20 | 104182 04/09/2020 Version F1 Delivery and Servicing Plan | ||
| SUPPORTING INFORMATION | 16-10-20 | 104182 04/09/2020 Version F1 Travel Plan | ||
| SUPPORTING INFORMATION | 16-10-20 | 70073356 Ref. 005 September 2020 Wind Microclimate Assessment | ||
| SUPPORTING INFORMATION | 16-10-20 | 55319 Rev. 03 September 2020 Fire Statement | ||
| SUPPORTING INFORMATION | 16-10-20 | SUPERSEDED Lighting Scheme - 55328-CBD-RP-CD-GLU-Y-75000 Issue V03 | ||
| SUPPORTING INFORMATION | 16-10-20 | A summary of the attachments in the proposal | ||
| SUPPORTING INFORMATION | 16-10-20 | SUPERSEDED Statement of Community Involvement | ||
| SUPPORTING INFORMATION | 16-10-20 | SUPERSEDED Statement of Community Involvement 2 of 2 | ||
| SUPPORTING INFORMATION | 16-10-20 | September 2020 Planning Statement | ||
| SUPPORTING INFORMATION | 16-10-20 | 70073356-002 September 2020 Archaeological Desk-Based Assessment | ||
| SUPPORTING INFORMATION | 16-10-20 | Part 1 - September 2020 Daylight, Sunlight and Overshadowing Report | ||
| SUPPORTING INFORMATION | 16-10-20 | Part 2 - September 2020 Daylight, Sunlight and Overshadowing Report | ||
| SUPPORTING INFORMATION | 16-10-20 | Outline DSWMP - Rev 01 Demolition and Site Waste Management Plan | ||
| SUPPORTING INFORMATION | 04-12-20 | Response to Contaminated Land Officers Comments Response to Contaminated Land Officers Comments | ||
| SUPPORTING INFORMATION | 04-12-20 | Response to Access Officer Comments Response to Access Officer Comments | ||
| SUPPORTING INFORMATION | 04-12-20 | Response to Air Quality Officer Comments Response to Air Quality Officer Comments | ||
| SUPPORTING INFORMATION | 04-12-20 | Response to Refuse and Waste Officer Comments Response to Refuse and Waste Officer Comments | ||
| SUPPORTING INFORMATION | 26-01-21 | Acoustic Technical Note Acoustic Technical Note | ||
| SUPPORTING INFORMATION | 26-01-21 | Response to Daylight and Sunlight Response to Daylight and Sunlight | ||
| SUPPORTING INFORMATION | 26-01-21 | Acoustic Planning Report dated January 2021 Acoustic Planning Report dated January 2021 | ||
| SUPPORTING INFORMATION | 02-03-21 | Harefield Road - Care Response Harefield Road - Care Response | ||
| SUPPORTING INFORMATION | 02-03-21 | Report on Length of Stay in Care Homes Report on Length of Stay in Care Homes | ||
| SUPPORTING INFORMATION | 02-03-21 | Better Lives for Older People Study Better Lives for Older People Study by Aston University | ||
| SUPPORTING INFORMATION | 02-03-21 | Economic Impact Assessment Economic Impact Assessment | ||
| SUPPORTING INFORMATION | 02-03-21 | Supporting Information Supporting Information in Relation to Similar Sites in the Borough | ||
| SUPPORTING INFORMATION | 02-03-21 | Supporting Information Supporting Information Relating to Transactions in Hillingdon | ||
| SUPPORTING INFORMATION | 02-03-21 | Experian Data for the Over 65 Age Group Experian Data for the Over 65 Age Group | ||
| SUPPORTING INFORMATION | 02-03-21 | Caterwood Planning Needs Assessment Caterwood Planning Needs Assessment | ||
| SUPPORTING INFORMATION | 02-03-21 | ONS Household Composition Data Hillingdon ONS Household Composition Data Hillingdon | ||
| SUPPORTING INFORMATION | 02-03-21 | Household Expenditure by Gross Income Quintile Gro Household Expenditure by Gross Income Quintile Group | ||
| SUPPORTING INFORMATION | 10-03-21 | Detailed Construction Logistics Plan dated March 2 Detailed Construction Logistics Plan dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Delivery and Servicing Plan dated March 2021 Delivery and Servicing Plan dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Travel Plan dated March 2021 Travel Plan dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Heritage, Townscape and Visual Impact Assessment Heritage, Townscape and Visual Impact Assessment Addendum dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Heritage, Townscape and Visual Impact Assessment Heritage, Townscape and Visual Impact Assessment Addendum, Part 2 dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Letter of Conformity (Wind) dated March 2021 Letter of Conformity (Wind) dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Statement of Community involvement Part 1 of 2 Statement of Community involvement Part 1 of 2 dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Statement of Community involvement Part 2 of 2 Statement of Community involvement Part 2 of 2 | ||
| SUPPORTING INFORMATION | 10-03-21 | Design and Access Statement Addendum dated 2021 Design and Access Statement Addendum dated 2021 - Part 1 of 2 | ||
| SUPPORTING INFORMATION | 10-03-21 | Design and Access Statement Addendum dated 2021 Design and Access Statement Addendum dated March 2021 - Part 2 of 2 | ||
| SUPPORTING INFORMATION | 10-03-21 | Fire Statement dated March 2021 Fire Statement dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Energy Statement dated March 2021 Energy Statement dated March 2021 Part 1 of 2 | ||
| SUPPORTING INFORMATION | 10-03-21 | Energy Statement dated March 2021 Energy Statement dated March 2021 - Part 2 of 2 | ||
| SUPPORTING INFORMATION | 10-03-21 | Utility Infrastructure Strategy dated March 2021 Utility Infrastructure Strategy dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Sustainability Statement dated March 2021 Sustainability Statement dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | 624_P_02_101 Rev. P03 Proposed Podium Garden | ||
| SUPPORTING INFORMATION | 10-03-21 | 624_P_02_102 Rev. P04 Green Roof Masterplan | ||
| SUPPORTING INFORMATION | 10-03-21 | Landscape Addendum Part 1 of 4 Landscape Addendum dated March 2021 - Part 1 of 4 | ||
| SUPPORTING INFORMATION | 10-03-21 | Landscape Addendum dated March 2021 Landscape Addendum dated March 2021 - Part 2 of 4 | ||
| SUPPORTING INFORMATION | 10-03-21 | Landscape Addendum dated March 2021 Landscape Addendum dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Landscape Addendum dated March 2021 Landscape Addendum dated March 2021 - Part 4 of 4 | ||
| SUPPORTING INFORMATION | 10-03-21 | Tree Survey & Arboricultural Assessment Tree Survey & Arboricultural Assessment dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Townscape Review dated March 2021 Townscape Review dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | FVA Addendum dated March 2021 FVA Addendum dated March 2021 | ||
| SUPPORTING INFORMATION | 10-03-21 | Letter of Conformity - Archaeological Desk Based A Letter of Conformity - Archaeological Desk Based Assessment | ||
| SUPPORTING INFORMATION | 10-03-21 | Letter of Conformity - Ecology Letter of Conformity | ||
| SUPPORTING INFORMATION | 10-03-21 | Air Quality Assessment Addendum dated March 2021 Air Quality Assessment Addendum dated March 2021 | ||
| SUPPORTING INFORMATION | 11-03-21 | Appendix 1: Daylight and Sunlight Principles Appendix 1: Daylight and Sunlight Principles | ||
| SUPPORTING INFORMATION | 11-03-21 | Internal Daylight, Sunlight Overshadowing Addendum Internal Daylight, Sunlight Overshadowing Addendum Report | ||
| SUPPORTING INFORMATION | 11-03-21 | Letter re: DSWM and CEMP Planning Review Confirmation relating to Demolition and Site Waste Management Plan and Construction Environmental Management Plan | ||
| SUPPORTING INFORMATION | 11-03-21 | Planning Statement Addendum dated March 2021 Planning Statement Addendum dated March 2021 | ||
| SUPPORTING INFORMATION | 11-03-21 | Letter of Conformity, Geo-environmental Assessment Letter of Conformity, Geo-environmental Assessment dated March 2021 | ||
| SUPPORTING INFORMATION | 11-03-21 | Daylight, Sunlight and Overshadowing Daylight, Sunlight and Overshadowing Letter of Conformity dated March 2021 | ||
| SUPPORTING INFORMATION | 12-04-21 | Overheating Risk Assessment Technical Note Overheating Risk Assessment Technical Note | ||
| SUPPORTING INFORMATION | 05-05-21 | Energy Statement Rev.5 Energy Statement Rev.5 | ||
| SUPPORTING INFORMATION | 05-05-21 | Circular Economy Statement dated April 2021 Circular Economy Statement | ||
| SUPPORTING INFORMATION | 05-05-21 | GLA Carbon Reporting Spreadsheet GLA Carbon Reporting Spreadsheet | ||
| SUPPORTING INFORMATION | 05-05-21 | GLA Be Seen Reporting Spreadsheet GLA Be Seen Reporting Spreadsheet | ||
| SUPPORTING INFORMATION | 05-05-21 | Whole Life Cycle Carbon Assessment dated April 202 Whole Life Cycle Carbon Assessment dated April 2021 | ||
| SUPPORTING INFORMATION | 05-05-21 | GLA WLC Assessment Spreadsheet GLA WLC Assessment Spreadsheet | ||
| SUPPORTING INFORMATION | 05-05-21 | GLA Consultation - Energy Memo GLA Consultation - Energy Memo | ||
| SUPPORTING INFORMATION | 10-05-21 | Revised Drawings Covering Letter dated May 2021 Revised Drawings Covering Letter dated May 2021 | ||
| SUPPORTING INFORMATION | 10-05-21 | Transport Technical Note Transport Technical Note | ||
| SITE NOTICE | 09-11-20 | |||
| TRANSPORT ASSESSMENT | 16-10-20 | 104182 04/09/2020 Version F1 Part 1 of 3 Transport Assessment | ||
| TRANSPORT ASSESSMENT | 16-10-20 | 104182 04/09/2020 Version F1 Part 2 of 3 Transport Assessment | ||
| TRANSPORT ASSESSMENT | 16-10-20 | 104182 04/09/2020 Version F1 Part 3 of 3 Transport Assessment | ||
| CULTURAL AND HERITAGE ASSESSMENT | 16-10-20 | Heritage and Townscape Assessment September 2020 Heritage and Townscape Assessment | ||
| ENERGY REPORT | 16-10-20 | 55319 Rev 02 September 2020 Energy Statement | ||
| FLOOD AND DRAINAGE ASSESSMENT | 16-10-20 | SUPERSEDED Utility Infrastructure Strategy | ||
| SUSTAINABILITY REPORT | 16-10-20 | 55319 Rev 02 September 2020 Sustainability Appraisal | ||
| TREE/LANDSCAPING REPORT | 16-10-20 | SUPERSEDED Landscape Design and Access Statement - September 2020 Part 1 | ||
| TREE/LANDSCAPING REPORT | 16-10-20 | SUPERSEDED Landscape Design and Access Statement | ||
| TREE/LANDSCAPING REPORT | 16-10-20 | SUPERSEDED Green Roof Masterplan | ||
| ECOLOGY REPORT | 16-10-20 | September 2020 Issue 02 Preliminary Ecological Appriasal | ||
| FLOOD AND DRAINAGE ASSESSMENT | 16-10-20 | 913-TSY-ZZ-XX-DR-C-8000 Rev P3 Proposed Drainage Layout Sheet 1 of 2 | ||
| FLOOD AND DRAINAGE ASSESSMENT | 16-10-20 | 913-TSY-ZZ-XX-DR-C-8001 Rev P2 Proposed Drainage Layout Sheet 2 of 2 | ||
| FLOOD AND DRAINAGE ASSESSMENT | 16-10-20 | 913-TSY-ZZ-XX-RP-C-1001 Rev 007 Drainage Strategy Report | ||
| FLOOD AND DRAINAGE ASSESSMENT | 16-10-20 | 913-TSY-ZZ-XX-RP-C-1001 DRAINAGE STRATEGY REPORT V Drainage documentation | ||
| TREE/LANDSCAPING REPORT | 16-10-20 | Arboricultural Report Tree survey | ||
| FLOOD AND DRAINAGE ASSESSMENT | 16-10-20 | FRA_v1 3 Flood risk assessment | ||
| AIR QUALITY REPORT | 16-10-20 | Hillingdon Guild Living Care Home J4170 F3 Air quality assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 1 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 10 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 11 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 12 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 13 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 2 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 3 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 4 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 5 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 6 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 7 of 13 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 8 of 1 Land contamination assessment | ||
| LAND ASSESSMENT | 16-10-20 | TE1306GIR1.2_Part 9 of 13 Land contamination assessment | ||
| TRANSPORT ASSESSMENT | 02-03-21 | Response to Highways Matters Response to Highways Matters | ||
| TRANSPORT ASSESSMENT | 10-03-21 | Transport Assessment Addendum dated March 2021 Transport Assessment Addendum dated March 2021 |
Decision Documentation
| DECISION NOTICE | 06-05-22 | |||
| OFFICER REPORT | 04-11-21 | Committee Report | ||
| OFFICERS REPORTS | 05-05-22 | Post Committee Amendments Report | ||
| OFFICERS REPORTS | 06-05-22 | |||
| SECTION 106 AGREEMENT | 05-05-22 | S106 completed 05/05/05 |