DOCUMENTS

Application Forms
APPLICATION FORM 03-06-26 Application Form redacted Application Form - Without Personal Data

Plans
LOCATION PLAN AMENDED 24-08-26 UBC6789998212PNM Rev F Proposed Location & Block Plan
DESIGN ACCESS STATEMENT (FULL DOCUMENT) 24-08-26 Design and Access Statement, Portakabin
SITE LAYOUT - LANDSCAPING 24-08-26 3580 - L100 Landscape General Arrangement Plan
EXISTING PLAN AMENDED 24-08-26 UBC6789998212PNM Rev. D Existing Location & Block Plan
EXISTING PLAN 24-08-26 HD/36364 Rev. A Existing Plan and Elevations
EXISTING PLAN 24-08-26 HD/36363 Existing Roof Plan
NOISE ASSESSMENT 24-08-26 Noise Assessment, Rev.2 17 August 2026, Cass Allen
NOISE ASSESSMENT 25-08-26 SUPERSEDED SUPERSEDED Biodiversity Net Gain Assessment, Issue 3.0, 20th May 2026 â?? Updated August 2026, Artech
PROPOSED PLAN 03-06-26 SUPERSEDED HD/14722/02 G SUPERSEDED Proposed floor plans and elevations
PROPOSED PLAN AMENDED 02-09-26 HD/14722/02 H Proposed Plans and Elevations (inc. Vinyl wrap)
PROPOSED PLAN AMENDED 02-09-26 HD/14722/02 H Proposed plans and elevations (revised)
PROPOSED ROOF PLANS 24-08-26 HD/14722/02 Rev. H Proposed Roof Plan, Ultima Complex Building
DESIGN ACCESS STATEMENT (FULL DOC) - SUPERSEDED 03-06-26 SUPERSEDED SUPERSEDED Design and Access Statement, Portakabin
PLAN - SUPERSEDED 03-06-26 SUPERSEDED UBC6789998212ENM SUPERSEDED Existing Location and Block plan
PLAN - SUPERSEDED 03-06-26 SUPERSEDED UBC6789998212PNM SUPERSEDED Proposed Location and Block plan

Supporting Documentation
SUPPORTING INFORMATION 03-06-26 Arboricultural Survey, Issue 01, 21 May 2026 Arbtech
SUPPORTING INFORMATION 03-06-26 Validation checklist
SUPPORTING INFORMATION 07-07-26 Photos of Vinyl wrapping- received 23-06-26
SUPPORTING INFORMATION 07-07-26 SUPERSEDED SUPERSEDED Elevations with Vinyl wrapping- received 23-06-26
SUPPORTING INFORMATION 24-08-26 Townscape and Visual Impact Assessment, August 2026, Iceni
SUPPORTING INFORMATION 24-08-26 Appendix 1 _ BBA Certificate Fire Safety Statement, Portakabin
SUPPORTING INFORMATION 24-08-26 Appendix 2 _ FA, EML, Refuge and Intruder Layouts Fire Safety Statement, Portakabin
SUPPORTING INFORMATION 24-08-26 Fire Safety Statement, Portakabin
SUPPORTING INFORMATION 24-08-26 Reinstatement Plan
SUPPORTING INFORMATION 25-08-26 Planning Statement, August 2026, Iceni
SUPPORTING INFORMATION 03-09-26 photos of vinyl wrapping
ADVERTISEMENT NOTICE 25-06-26 West London Gazette 24.06.2026
ECOLOGY REPORT 03-06-26 Preliminary Ecological Appraisal & Roost Assessment, Issue 1.0, 20/05/2026, Arbtech
TRANSPORT ASSESSMENT 24-08-26 Transport Statement, August 2026, Iceni
ENERGY REPORT 24-08-26 SUPERSEDED SUPERSEDED Energy Statement, August 2026, Iceni
FLOOD AND DRAINAGE ASSESSMENT 24-08-26 Water Efficiency Statement, August 2026, Iceni
FLOOD AND DRAINAGE ASSESSMENT 24-08-26 Flood Risk Assessment and Sustainable Drainage Strategy, August 2026, Iceni
TREE/LANDSCAPING REPORT 24-08-26 Arbtech AIA 02 Arboricultural Impact Assessment
TREE/LANDSCAPING REPORT 24-08-26 Arboricultural Method Statement, 10 August 2026, Arbtech
TREE/LANDSCAPING REPORT 24-08-26 Arbtech TPP 02 Tree Protection Plan
AIR QUALITY REPORT 24-08-26 Air Quality Appraisal, Rev.1, 17 August 2026, Cass Allen
ECOLOGY REPORT 25-08-26 SUPERSEDED SUPERSEDED Preliminary Ecological Appraisal & Roost Assessment, Issue 2.0, 24/08/2026, Arbtech
ENERGY REPORT 17-09-26 Energy Statement, September 2026, Iceni Projects
ADDITIONAL DOCUMENTS 17-09-26 Method Statement for Contract Lifting and Moving Operation, 09/07/2026, Southern Cranes & Access
ADDITIONAL DOCUMENTS 17-09-26 Method Statement for Contract Lifting and Moving Operation, 09/07/2026, Southern Cranes & Access
ADDITIONAL DOCUMENTS 17-09-26 Construction Management Plan, 05/05/26, Portakabin
FLOOD AND DRAINAGE ASSESSMENT 22-09-26 Part 2 Flood Risk Assessment and Sustainable Drainage Strategy, September 2026, Iceni Projects
FLOOD AND DRAINAGE ASSESSMENT 22-09-26 Part 3 Flood Risk Assessment and Sustainable Drainage Strategy, September 2026, Iceni Projects
FLOOD AND DRAINAGE ASSESSMENT 22-09-26 Part 1 Flood Risk Assessment and Sustainable Drainage Strategy, September 2026, Iceni Projects
ECOLOGY REPORT 23-09-26 Preliminary Ecological Appraisal & Roost Assessment, Issue 3.0, 11/09/2026, ArbTech
SUPPORTING INFORMATION - SUPERSEDED 03-06-26 SUPERSEDED SUPERSEDED Arboricultural Method Statement, 22/05/26, Issue 01, Arbtech
SUPPORTING INFORMATION - SUPERSEDED 03-06-26 SUPERSEDED Arbtech TPP 01 SUPERSEDED Tree protection plan
SUPPORTING INFORMATION - SUPERSEDED 03-06-26 SUPERSEDED Arbtech AIA 01 SUPERSEDED Arboricultural Impact Assessment

Decision Documentation
There are no documents for this section