DOCUMENTS

Application Forms
APPLICATION FORM AMENDED 26-02-25

Plans
LOCATION PLAN 31-12-24 4478-0108 Rev P01 Site Location Plan
SITE LAYOUT - EXISTING 31-12-24 4478-0100 Rev P04 SUPERSEDED Site Plan as Existing
SITE LAYOUT - EXISTING 25-02-25 4478-0100 Rev P05 Site Plan as Existing
SITE LAYOUT - PROPOSED 25-02-25 4478-0105 Rev P12 Site Plan as Proposed
SITE LAYOUT - LANDSCAPING 18-02-25 BEA-24-038-001 Rev P04 Detailed Landscape Proposals
SITE LAYOUT - SITE LEVELS 25-02-25 4478-0106 Rev P11 Site Levels Plan as Proposed
EXISTING FLOOR PLANS 25-02-25 4478-0304 Rev P01 Ground Floor Plan as Existing
EXISTING FLOOR PLANS 25-02-25 4478-0305 Rev P01 First Floor Plan as Existing
EXISTING FLOOR PLANS 25-02-25 4478-0306 Rev P01 Roof Plan as Existing
NOISE ASSESSMENT 18-02-25 10890/BL Rev B Noise Impact Assessment (prepared by Acoustic Consultants, Rev B, dated 07-01-2025)
EXISTING ELEVATIONS 25-02-25 4478-0407 Rev P01 Elevations as Existing (Sheet 01 of 02). NE and SW Elevations
EXISTING ELEVATIONS 25-02-25 4478-0408 Rev P01 Elevations as Existing (Sheet 02 of 02). SE and NW Elevations
EXISTING SECTIONS 25-02-25 4478-0502 Rev P01 Sections as Existing
PROPOSED PLAN 25-02-25 4478-0303 Rev P02 Store Plan as Proposed
PROPOSED ELEVATIONS 25-02-25 4478-0400 Rev P06 East Elevation as Proposed
PROPOSED ELEVATIONS 25-02-25 4478-0401 Rev P06 West Elevation as Proposed
PROPOSED ELEVATIONS 25-02-25 4478-0402 Rev P06 South Elevation as Proposed
PROPOSED ELEVATIONS 25-02-25 4478-0406 Rev P01 North Elevation as Proposed
PROPOSED ROOF PLANS 25-02-25 4478-0301 Rev P02 Roof Plan as Proposed
PROPOSED SECTIONS 25-02-25 4478-0501 Rev P01 Section B-B as Proposed

Supporting Documentation
DESIGN AND ACCESS STATEMENT 18-02-25 22-00213 Design and Access Statement (prepared by Rapleys, dated February 2025)
LAND ASSESSMENT 18-02-25 1246.01.01 (21-03-2024) Phase 1 Contamination Site Investigation & Preliminary Risk Assessment (prepared by Remada Geoconsultants, dated March 2024)
LAND ASSESSMENT 18-02-25 1246.02.01 (24.04.2024) Phase 2 Contamination Ground Investigation (prepared by Remada Geoconsultants, dated April 2024)
TRANSPORT ASSESSMENT 18-02-25 16-2273, T003 Issue No. 1 Delivery and Service Management Plan (prepared by Cora IHT, dated January 2025)
TRANSPORT ASSESSMENT 18-02-25 16-2273, T002 Issue No. 2 Transport Assessment (prepared by Cora IHT, dated January 2025)
TRANSPORT ASSESSMENT 18-02-25 16-2273, T002 Issue No. 2 Travel Plan (prepared by Cora IHT, dated January 2025)
CULTURAL AND HERITAGE ASSESSMENT 18-02-25 24038 / DP / TVA001B Townscape & Visual Appraisal (prepared by Bea Landscape Design, dated 15/05/2024)
ADDITIONAL DOCUMENTS 18-02-25 Statement of Community Involvement (prepared by The Terrapin Group, dated January 2025)
AIR QUALITY REPORT 18-02-25 24-13230, Final version 10/01/2025) Air Quality Assessment (prepared by Syntegra, dated June 2024, final dated 10/01/2025)
ADDITIONAL DOCUMENTS 18-02-25 3649.PFSS.03.02.25 (V02) Planning Fire Safety Strategy (prepared by BB7, dated 03.02.2025)
ADDITIONAL DOCUMENTS 18-02-25 DWG 01 Rev 1 & DWG 00 Rev 1 Proposed Lighting Layout & Luminaire Schedule
TREE/LANDSCAPING REPORT 18-02-25 AWA6395 Arboricultural Report & Impact Assessment (prepared by FDA Landscape, dated January 2025)
ECOLOGY REPORT 18-02-25 BIOC23-242 (V2) Preliminary Ecological Appraisal (prepared by Biodiverse Consulting, V2 dated 21/01/2025)
ENERGY REPORT 18-02-25 24-4571 Revision B Energy Usage & Sustainability Statement (prepared by C. Naylor & S. Ogden, Revision B dated 27.05.2025)
RETAIL IMPACT ASSESSMENT 18-02-25 22-00213 Planning & Retail Statement (prepared by Rapleys, dated February 2025)
FLOOD AND DRAINAGE ASSESSMENT 18-02-25 T001 Issue 3 Flood Risk Assessment and Water Cycle Study (prepared by Cora IHT, Issue 3 dated 10-01-2025)
CULTURAL AND HERITAGE ASSESSMENT 18-02-25 Heritage Assessment (prepared by Border Archaeology, updated February 2025)

Decision Documentation