DOCUMENTS

Application Forms
APPLICATION FORM AMENDED 28-03-25 Application Form Hybrid Application for Full Planning Permission and Outline Planning Permission (Redacted) AMENDED

Plans
LOCATION PLAN 24-03-25 LONUX-NWA-SW-ZZ-DR-A-10200 Rev. P01 Site Location Plan
BLOCK PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12201 Rev. P01 Site Plan - Roof Level SUPERSEDED
SITE LAYOUT - EXISTING 24-03-25 LONUX-NWA-SW-ZZ-DR-A-10201 Rev. P01 Site Plan - Existing
SITE LAYOUT - PROPOSED 24-03-25 LON6-NWA-PL-ZZ-DR-A-12220 Rev. P01 LON6 Site Plan SUPERSEDED
SITE LAYOUT - PROPOSED 26-08-25 LONUX-ARUP-SW-LP-DR-C-10205 Rev. P01.02 Uxbridge Road S278 Works Proposed General Arrangement (Resurfacing Option) SUPERSEDED
SITE LAYOUT - LANDSCAPING 24-03-25 LON6-MWL-DC-ZZ-DR-LD-10200 P01.03 LON6 Landscape Masterplan SUPERSEDED
SITE LAYOUT - LANDSCAPING 24-03-25 LON6-MWL-DC-ZZ-DR-LD-10202 P01.03 LON6 Metro Bank Landscape Vignette
SITE LAYOUT - LANDSCAPING 24-03-25 LON6-MWL-DC-ZZ-DR-LD-10203 P01.02 LON6 Yeading Brook Landscape Vignette SUPERSEDED
SITE LAYOUT - LANDSCAPING 24-03-25 LON6-MWL-DC-ZZ-DR-LD-10204 P01.02 LON6 Landscape Vignette - Staff Amenity Gardens
SITE LAYOUT - LANDSCAPING 24-03-25 12157 TCP 01 (1/4), (2/4), (3/4) and (4/4) Tree Constraints Plan (4 plans together)
NOISE ASSESSMENT 24-03-25 LONUX-CDL-ZZ-XX-RP-Z-00005 Rev. P01 Noise Impact Assessment (Dated 14th March 2025)
NOISE ASSESSMENT 10-06-25 LONUX-CDL-PL-XX-TI-YA-00001 Rev. P01 Technical Note - Outline noise planning condition comment (Dated 6th June 2025)
PROPOSED PLAN 24-03-25 LON6-MWL-DC-ZZ-DR-LD-10201 Rev. P01.03 LON6 Urban Greening Factor SUPERSEDED
PROPOSED FLOOR PLANS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12222 Rev. P01 LON6 Basement & Ground Floor Plans
PROPOSED FLOOR PLANS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12223 Rev. P01 LON6 First & Second Floor Plans
PROPOSED FLOOR PLANS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12224 Rev. P01 LON6 Third & Fourth Floor Plans
PROPOSED FLOOR PLANS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12225 Rev. P01 LON6 Fifth & Sixth Floor Plans SUPERSEDED
PROPOSED PLAN 24-03-25 LONUX-CDL-ZZ-XX-RP-E-00001 Rev. P01 External Lighting Plan
PROPOSED ELEVATIONS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12421 Rev. P01 LON6 Elevations - South & West SUPERSEDED
PROPOSED ELEVATIONS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12422 Rev. P01 LON6 Elevations - North & East SUPERSEDED
PROPOSED ELEVATIONS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12423 Rev. P01 LON6 Detailed Elevation - East SUPERSEDED
PROPOSED ELEVATIONS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12424 Rev. P01 LON6 Detailed Elevation - North SUPERSEDED
PROPOSED ELEVATIONS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12425 Rev. P01 LON6 Detailed Elevation - West SUPERSEDED
PROPOSED SECTIONS 24-03-25 LON6-NWA-PL-ZZ-DR-A-12430 Rev. P01 LON6 Sections SUPERSEDED
PLAN 24-03-25 LONUX-MWL-SW-ZZ-DR-LD-10200 P01.03 Illustrative Site Wide Landscape Principles Plan SUPERSEDED
PLAN 24-03-25 LONUX-MWL-SW-ZZ-DR-LD-10201 Rev. P01.03 Site Wide Urban Greening Factor Potential Plan SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-00-DR-A-12230 Rev. P01 LON6 Transformers SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-00-DR-A-12231 Rev. P01 Gate House SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12400 Rev. P01 Site Context Elevations SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12801 Rev. P01 Parameter Site Plan - Plots/Blocks SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12802 Rev. P01 Parameter Site Plan - Heights (Site Plan) SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12803 Rev. P01 Parameter Site Section - Heights (Longitudinal Section) SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12806 Rev. P01 Parameter Site Plan - Basement SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12807 Rev. P01 Parameter Site Plan - Land Use SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12809 Rev. P01 Parameter Site Plan - Landscape SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12810 Rev. P01 Parameter Site Plan - Roof Plan SUPERSEDED
PLAN 24-03-25 LONUX-NWA-PL-ZZ-DR-A-12840 Rev. P01 Site Plan - Fencing Plan SUPERSEDED
PLAN 08-07-25 LONUX-NWA-PL-ZZ-DR-A-21000 Rev. P01 Site Plan - Building Coordinates (in response to Ministry of Defence (MoD))
PLAN AMENDED 12-08-25 LON6-MWL-DC-ZZ-DR-LD-10200 P02 LON6 Landscape Masterplan AMENDED
PLAN AMENDED 12-08-25 LON6-MWL-DC-ZZ-DR-LD-10201 Rev. P02 LON6 Urban Greening Factor AMENDED
PLAN AMENDED 12-08-25 LON6-MWL-DC-ZZ-DR-LD-10203 P02 LON6 Yeading Brook Landscape Vignette AMENDED
PLAN AMENDED 12-08-25 LON6-NWA-PL-ZZ-DR-A-12220 Rev. P02 LON6 - Site Plan AMENDED
PLAN AMENDED 12-08-25 LON6-NWA-PL-ZZ-DR-A-12225 Rev. P02 LON6 - Fifth & Sixth Floor Plans AMENDED
PLAN AMENDED 12-08-25 LON6-NWA-PL-ZZ-DR-A-12421 Rev. P02 LON6 - Elevations - South & West AMENDED
PLAN AMENDED 12-08-25 LON6-NWA-PL-ZZ-DR-A-12422 Rev. P02 LON6 - Elevations - North & East AMENDED
PLAN AMENDED 12-08-25 LON6-NWA-PL-ZZ-DR-A-12423 Rev. P02 LON6 - Detailed Elevation East AMENDED
PLAN AMENDED 12-08-25 LON6-NWA-PL-ZZ-DR-A-12424 Rev. P02 LON6 - Detailed Elevation North AMENDED
PLAN AMENDED 12-08-25 LON6-NWA-PL-ZZ-DR-A-12425 Rev. P02 LON6 - Detailed Elevation West AMENDED
PLAN AMENDED 12-08-25 LON6-NWA-PL-ZZ-DR-A-12430 Rev. P02 LON6 - Sections AMENDED
PLAN AMENDED 12-08-25 LONUX-MWL-SW-ZZ-DR-LD-10200 P02 Illustrative Site Wide Landscape Principles Plan AMENDED
PLAN AMENDED 12-08-25 LONUX-MWL-SW-ZZ-DR-LD-10201 Rev. P02 Site Wide Urban Greening Factor Potential Plan AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-00-DR-A-12230 Rev. P02 LON6 Transformers AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-00-DR-A-12231 Rev. P02 Gate House AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12201 Rev. P02 Site Plan - Roof Level AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12400 Rev. P02 Site Context Elevations AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12801 Rev. P02 Parameter Site Plan - Plots/Blocks AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12802 Rev. P02 Parameter Site Plan - Heights (Site Plan) AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12803 Rev. P02 Parameter Site Section - Heights (Longitudinal Section) AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12806 Rev. P02 Parameter Site Plan - Basement AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12807 Rev. P02 Parameter Site Plan - Land use AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12809 Rev. P02 Parameter Site Plan - Landscape AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12810 Rev. P02 Parameter Site Plan - Roof Plan AMENDED
PLAN AMENDED 12-08-25 LONUX-NWA-PL-ZZ-DR-A-12840 Rev. P02 Site Plan - Fencing Plan AMENDED
PLAN AMENDED 18-09-25 LONUX-ARUP-SW-LP-DR-C-10201 Rev. P02 Proposed North Entrance General Arrangement Layout (For S106 Agreement, relating to S278 Highways Agreement) SUPERSEDED
PLAN AMENDED 04-12-25 LONUX-ARUP-SW-LP-DR-C-10208 Rev. P01.01 LON6 S106 Agreement - S278 Extents

Supporting Documentation
DESIGN AND ACCESS STATEMENT 25-03-25 LONUX-NWA-SW-XX-RP-A-00002 Rev. P01 Design Code (Dated 21st March 2024) SUPERSEDED
DESIGN AND ACCESS STATEMENT 25-03-25 Design and Access Statement Rev. P01 Part 1 of 4 (Dated 18th March 2025) SUPERSEDED
DESIGN AND ACCESS STATEMENT 25-03-25 Design and Access Statement Rev. P01 Part 2 of 4 (Dated 18th March 2025) SUPERSEDED
DESIGN AND ACCESS STATEMENT 25-03-25 Design and Access Statement Rev. P01 Part 3 of 4 (Dated 18th March 2025) SUPERSEDED
DESIGN AND ACCESS STATEMENT 25-03-25 Design and Access Statement Rev. P01 Part 4 of 4 (Dated 18th March 2025) SUPERSEDED
DESIGN AND ACCESS STATEMENT 12-08-25 LONUX-NWA-SW-XX-RP-A-00002 Rev. P02 Design Code (Dated 8th August 2025) AMENDED
DESIGN AND ACCESS STATEMENT 12-08-25 Design and Access Statement Rev. P02 Part 1 of 4 (Dated 8th August 2025) AMENDED
DESIGN AND ACCESS STATEMENT 12-08-25 Design and Access Statement Rev. P02 Part 2 of 4 (Dated 8th August 2025) AMENDED
DESIGN AND ACCESS STATEMENT 12-08-25 Design and Access Statement Rev. P02 Part 3 of 4 (Dated 8th August 2025) AMENDED
DESIGN AND ACCESS STATEMENT 12-08-25 Design and Access Statement Rev. P02 Part 4 of 4 (Dated 8th August 2025) AMENDED
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 1.1 Assessor Information (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 1.2 Glossary of Abbreviations and Terms (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 1.3 LBH Screening Opinion (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.1 Framework Travel Plan (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.10 Outline Construction Management Plan (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.2 Delivery, Servicing and Waste Management Plan (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.3 Site Wide Landscape Design Statement (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.4 Outline Landscape Maintenance and Management Plan (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.5 Drainage Strategy - Appendix A-E (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.5 Drainage Strategy - Appendix F-I (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.5 Drainage Strategy (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.6 Energy and Sustianability Statement (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.7 Circular Economy Statement (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.8 Utility Statement (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 3.9 External Lighting design (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 6.1 Air Quality Appendix (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 7.1 Contextualisation of GHG Emissions with Local and National Carbon Budgets (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 7.2 - Gas and Electricity Consumption (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 7.3 - Summary of Estimated Energy Use and Associated Operational GHG Emissions (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Appendix 7.4 - Annual Estimated Operational GHG Emissions Accounting for Grid Decarbonisation (Volume 2)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Chapter 00 Cover and Contents (Volume 1a)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Chapter 01 Introduction (Volume 1a)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Chapter 02 Site and Local Context (Volume 1a)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Chapter 03 Proposed Development (Volume 1a)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Chapter 04 Consultation, Alternatives and Design Evolution (Volume 1a)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Chapter 05 Approach to Assessment (Volume 1a)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Chapter 06 Air Quality (Volume 1a)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Chapter 07 GHG and Climate Change (Volume 1a)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Chapter 08 Summary of mitigation, residual and interaction effects (Volume 1a)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Figure 2.1 Site Location Plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Figure 3.2 - Parameter Site Plan - Plots Blocks (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Figure 3.3 Parameter Site Plan - Heights (Site Plan) (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Figure 3.4 - Parameter Site Section - Heights (Longitudinal Section) (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Figure 3.5 - Parameter Site Plan - Land use (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Figure 3.6 - Parameter Site Plan - Landscape (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Figure 3.7 - Parameter Site Plan - Roof plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Figure 3.8 - Parameter Site Plan - Basement (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 EIA Non-Technical Summary (Dated March 2025)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 Landscape Masterplan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 Urban Greening Factor Plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 Metro Bank Landscape Vignette (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 Yeading Brook Landscape Vignette (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 Staff Garden Landscape Vignette (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Site Plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Basement & Ground Floor Plans (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - First & Second Floor Plans (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Third & Fourth Floor Plans (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Fifth & Sixth Floor Plans (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Elevations - South & West (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Elevations - North & East (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Detailed Elevation East (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Detailed Elevation North (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Detailed Elevation West (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 - Sections (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Drainage Strategy Plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Lighting Layout (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Landscape Masterplan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Urban Greening Factor (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Landscape Sections (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Proposed Ground Floor Plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Proposed Roof Plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Proposed Site Plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Proposed Aerial View (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Proposed Fence Plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Existing and Proposed West Elevations (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Existing and Proposed East Elevation (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Existing and Proposed South Elevations (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Existing and Proposed North Elevations (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Proposed Control Room Elevations (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Substation 2 Proposed Transformer Elevations (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Illustrative Site Wide Landscape Plan (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) LON6 Transformers (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Gate House (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Site Plan - Roof Level (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Site Context Elevations (Volume 1b)
ENVIRONMENTAL ASSESSMENT STATEMENT 25-03-25 Environmental Statement (Dated March 2025) Site Plan - Fencing Plan (Volume 1b)
SUPPORTING INFORMATION 24-03-25 LONUX-ARUP-PL-XX-RP-Z-00001 Rev. P01 Outline Construction Management Plan (Dated 14th March 2025)
SUPPORTING INFORMATION 24-03-25 LONUX-ARUP-PL-XX-RP-Z-00003 Rev. P01 Delivery, Servicing and Waste Management Plan (Dated 14th March 2025)
SUPPORTING INFORMATION 24-03-25 Biodiversity Net Gain Assessment (Dated March 2025)
SUPPORTING INFORMATION 24-03-25 Biodiversity Calculation Metric Spreadsheet
SUPPORTING INFORMATION 24-03-25 LONUX-CDL-ZZ-XX-RP-Y-00001 Rev. P01 LON6 Fire Statement (Dated 14th March 2025)
SUPPORTING INFORMATION 24-03-25 LONUX-CDL-ZZ-XX-RP-Y-00002 Rev. P01 LON6 Utility Statement (Dated 14th March 2025)
SUPPORTING INFORMATION 24-03-25 LONUX-CDL-ZZ-XX-RP-Z-00004 Rev. P01 LON6 Microclimate & Wind Assessment (Dated 14th March 2025)
SUPPORTING INFORMATION 24-03-25 Statement of Community Involvement
SUPPORTING INFORMATION 24-03-25 CL-6159-RPT-002 V1.0 Technical Safeguarding Assessment (Dated 11th March 2025)
SUPPORTING INFORMATION 24-03-25 CL-6159-RPT-003 V1.0 OLS Safeguarding Assessment (Dated 11th March 2025)
SUPPORTING INFORMATION 24-03-25 6599 Daylight and Sunlight Report (Dated 18th February 2025)
SUPPORTING INFORMATION 24-03-25 Heritage, Townscape, and Visual Impact Assessment (Dated March 2025) (Part 1)
SUPPORTING INFORMATION 24-03-25 Heritage, Townscape, and Visual Impact Assessment (Dated March 2025) (Part 2)
SUPPORTING INFORMATION 24-03-25 Heritage, Townscape, and Visual Impact Assessment (Dated March 2025) (Part 3)
SUPPORTING INFORMATION 24-03-25 Heritage, Townscape, and Visual Impact Assessment (Part 4) (Dated March 2025)
SUPPORTING INFORMATION 24-03-25 Archaeological Desk-Based Assessment (Dated February 2025)
SUPPORTING INFORMATION 24-03-25 LONUX-MWL-SW-ZZ-RP-LD-12000 P01.03 Outline Landscape Maintenance and Management Plan (Dated 21st March 2025) SUPERSEDED
SUPPORTING INFORMATION 24-03-25 Infrastructure Statement (Dated February 2025)
SUPPORTING INFORMATION 24-03-25 Economic Impact Assessment (Dated March 2025)
SUPPORTING INFORMATION 24-03-25 Hayes Digital Park Innovation Hub Outline Strategy (Dated March 2025)
SUPPORTING INFORMATION 25-03-25 Health Impact Assessment Rev. 3 (Dated March 2025)
SUPPORTING INFORMATION 25-03-25 Planning Statement (Dated March 2025)
SUPPORTING INFORMATION 14-05-25 Applicant Response to Flood and Water Management (Metis) Comments
SUPPORTING INFORMATION 10-06-25 Response to Design Officer Comments Rev. P01 (Dated 29th April 2025)
SUPPORTING INFORMATION 21-07-25 Supplementary HTVIA Technical Note (Dated July 2025)
SUPPORTING INFORMATION 21-07-25 NWA-0522-XX-XX-REP-A-XXX Rev. P01 Planning Design Meeting (Dated 23rd July 2025)
SUPPORTING INFORMATION 12-08-25 LONUX-MWL-PL-XX-RP-LD-12003 P02 Site Wide Landscape Design Statement (Dated 6th August 2025)
SUPPORTING INFORMATION 12-08-25 LONUX-MWL-SW-ZZ-RP-LD-12000 P02 Outline Landscape Maintenance and Management Plan (Dated 6th August 2025) AMENDED
SUPPORTING INFORMATION 02-09-25 Site Phasing Plan Pages 6 and 7 of document LONUX-NWA-SW-XX-RP-A-00002 Rev. P02 Design Code (Dated 8th August 2025)
SUPPORTING INFORMATION 04-09-25 Applicant Response to GLA on Power
ADVERTISEMENT NOTICE 10-04-25 West London Gazette 09.04.2025
SUSTAINABILITY REPORT 24-03-25 LIH1-CDL-B-XX-RP-Z-00001 Rev. P01 Innovation Hub - BREEAM New Construction V6 - Pre-Assessment (Dated 14th March 2025)
TRANSPORT ASSESSMENT 24-03-25 LONUX-ARUP-PL-XX-RP-Z-00004 Rev. P01 Framework Travel Plan (Dated 14th March 2025)
TRANSPORT ASSESSMENT 24-03-25 LONUX-ARUP-PL-XX-RP-Z-00005 Rev. P01 Transport Assessment (Dated 14th March 2025) SUPERSEDED
LAND ASSESSMENT 24-03-25 LONUX-ARUP-PL-XX-RP-Z-00006 Rev. P01 Geotechnical Desk Study Report (Dated 14th March 2025)
LAND ASSESSMENT 24-03-25 LONUX-ARUP-PL-XX-RP-Z-00007 Rev. P01 Ground Contamination Preliminary Risk Assessment (Dated 14th March 2025)
LAND ASSESSMENT 24-03-25 LONUX-ARUP-PL-XX-RP-Z-00007 Rev. P01 Appendix A: Groundsure report - Ground Contamination Preliminary Risk Assessment (Dated 14th March 2025)
FLOOD AND DRAINAGE ASSESSMENT 24-03-25 LONUX-ARUP-PL-XX-RP-Z-00008 Rev. P01 Flood Risk Assessment (Dated 14th March 2025)
FLOOD AND DRAINAGE ASSESSMENT 24-03-25 LONUX-ARUP-SW-LP-RP-C-52001 Rev. P01 Drainage Strategy (Dated 14th March 2025)
FLOOD AND DRAINAGE ASSESSMENT 24-03-25 LONUX-ARUP-SW-LP-RP-C-52001 Rev. P01 Appendix A - London Borough of Hillingdon SuDS Pro Forma - Drainage Strategy (Dated 14th March 2025)
FLOOD AND DRAINAGE ASSESSMENT 24-03-25 LONUX-ARUP-SW-LP-RP-C-52001 Rev. P01 Appendix F-I Calculations - Drainage Strategy (Dated 14th March 2025)
TREE/LANDSCAPING REPORT 24-03-25 12157_AIA.002 Rev A Arboriculture Impact Assessment (Dated March 2025)
ECOLOGY REPORT 24-03-25 Ecological Appraisal (Dated February 2025)
TREE/LANDSCAPING REPORT 24-03-25 12157 TS 01 BS 5837:2012 Tree Schedule
SUSTAINABILITY REPORT 24-03-25 LONUX-CDL-DC-XX-RP-Z-00001 Rev. P01 LON6 - BREEAM 2010 - Data Centre v1.1 (Dated 14th March 2025)
SUSTAINABILITY REPORT 24-03-25 LONUX-CDL-ZZ-XX-RP-Z-00008 Rev. P01 LON6 Water Cycle Strategy (Dated 14th March 2025)
TREE/LANDSCAPING REPORT 24-03-25 LONUX-MWL-PL-XX-RP-LD-12003 P01.03 Site Wide Landscape Design Statement (Dated 21st March 2025) SUPERSEDED
SUSTAINABILITY REPORT 25-03-25 GLA Circular Economy Statement Spreadsheet
SUSTAINABILITY REPORT 25-03-25 Circular Economy Statement Rev. 2 (Dated March 2025)
SUSTAINABILITY REPORT 25-03-25 Whole Life Carbon Assessment Rev. 3 (Dated March 2025)
ENERGY REPORT 25-03-25 LONUX-CDL-ZZ-XX-RP-Z-00002 Rev. P01 Energy and Sustainability Statement (Dated 21st March 2025)
ENERGY REPORT 25-03-25 Part l 2021 GLA Detailed LON6 Carbon Emission Reporting Updated Spreadsheet
ENERGY REPORT 25-03-25 Part l 2021 GLA Outlined Overall Carbon Emission Reporting Updated Spreadsheet
SUSTAINABILITY REPORT 25-03-25 Rev2 Innovation Hub LPG Whole Lide Carbon Assessment (WLCA) Template (Dated 25th March 2025)
SUSTAINABILITY REPORT 25-03-25 Rev2 LON06 LPG Whole Life Carbon Assessment (WLCA) Template (Dated 25th March 2025)
SUSTAINABILITY REPORT 25-03-25 Rev2 LON07 LPG Whole Life Carbon Assessment (WLCA) Template (Dated 25th March 2025)
SUSTAINABILITY REPORT 25-03-25 Rev2 LON08 LPG Whole Life Carbon Assessment (WLCA) Template (Dated 25th March 2025)
ADDITIONAL DOCUMENTS 30-05-25 20250508_LONUX-ARUP-SS-SS- Stormwater Catchment Plan - Requested by Metis
TRANSPORT ASSESSMENT 12-08-25 LONUX-ARUP-PL-XX-RP-Z-00005 Rev. P02 Transport Assessment (Dated 5th August 2025) AMENDED
AIR QUALITY REPORT 12-08-25 LONUX-CDL-SW-XX-TI-Y-00001 Rev. P02 Design Note - Air Quality Damage Costs (Dated 8th August 2025)

Decision Documentation
OFFICER REPORT 03-10-25 Committee Report Addendum
OFFICER REPORT 03-10-25 COMMITTEE REPORT
OFFICER REPORT 29-10-25 COMMITTEE REPORT ADDENDUM
OFFICERS REPORTS 29-10-25 COMMITTEE REPORT