DOCUMENTS
Application Forms
| APPLICATION FORM | 16-07-24 | Application Form - Without Personal Data |
Plans
| BLOCK PLAN | 16-07-24 | E21-038/SIT100 C Block plan of the site | ||
| SITE LAYOUT - PROPOSED | 27-04-25 | BD 0205 SD 801 R09 Illustrative Landscape Master Plan 22/4/25 | ||
| SITE LAYOUT - PROPOSED | 27-04-25 | E21-038/SIT100 Rev E Estate Master Plan (with play space, open space and amenity areas) 22/4/25 | ||
| PROPOSED PLAN | 16-07-24 | E21-038/SIT100 C External Amenity Area | ||
| PROPOSED FLOOR PLANS | 16-07-24 | E21-038/M4(3).1 P3 Proposed ground floor plan (Unit 1) | ||
| PROPOSED FLOOR PLANS | 16-07-24 | E21-038/M4(3).2+3 P3 Proposed ground floor plan (Units 2 & 3) | ||
| PROPOSED FLOOR PLANS | 16-07-24 | E21-038/M4(3).4+5 P3 Proposed ground floor plan (Units 4&5) | ||
| PROPOSED FLOOR PLANS | 16-07-24 | E21-038/M4(3).6+7 P3 Proposed ground floor plan (Units 6 & 7) | ||
| PROPOSED FLOOR PLANS | 16-07-24 | E21-038/PRP001 P5 Proposed first floor plan | ||
| PROPOSED FLOOR PLANS | 16-07-24 | E21-038/PRP002 P5 Proposed second floor plan | ||
| PROPOSED FLOOR PLANS | 16-07-24 | E21-038/PRP003 P5 Proposed third floor plan | ||
| PROPOSED FLOOR PLANS | 16-07-24 | E21-038/PRP004 P5 Proposed fourth floor plan | ||
| PROPOSED FLOOR PLANS | 16-07-24 | E21-038/PRP00G P4 Proposed ground floor plan | ||
| PROPOSED FLOOR PLANS AMENDED | 27-04-25 | E21-038/PRP001 Rev P6 Proposed First Floor Plan 22/4/25 | ||
| PROPOSED FLOOR PLANS AMENDED | 27-04-25 | E21-038/PRP002 Rev P6 Proposed Second Floor Plan 22/4/25 | ||
| PROPOSED FLOOR PLANS AMENDED | 27-04-25 | E21-038/PRP003 Rev P6 Proposed Third Floor Plan - 22/4/25 | ||
| PROPOSED FLOOR PLANS AMENDED | 27-04-25 | E21-038/PRP004 Rev P6 Proposed Fourth Floor Plan 22/4/25 | ||
| PROPOSED FLOOR PLANS AMENDED | 27-04-25 | E21-038/PRP00G Rev P8 Proposed Ground Floor Plan 22/4/25 | ||
| PROPOSED ELEVATIONS | 16-07-24 | E21-038/PRE001 P2 Proposed elevations - north and south | ||
| PROPOSED ELEVATIONS | 16-07-24 | E21-038/PRE002 P1 Proposed elevations - East and west | ||
| PROPOSED ELEVATIONS AMENDED | 27-04-25 | E21-038/PRE001 Rev P3 Proposed Elevation Plan (North and South) 22/4/25 | ||
| PROPOSED ELEVATIONS AMENDED | 27-04-25 | E21-038/PRE002 Rev P2 Proposed Elevation Plan (East and West) 22/4/25 | ||
| PROPOSED SECTIONS | 16-07-24 | E21-038/PRS001 P1 Proposed sections | ||
| PROPOSED SECTIONS AMENDED | 27-04-25 | BD 0205 SD 101 R08 Illustrative Landscape Section A-A 22/4/25 | ||
| PROPOSED SECTIONS AMENDED | 27-04-25 | BD 0205 SD 102 R08 Illustrative Landscape Section B-B 22/4/25 |
Supporting Documentation
| DESIGN AND ACCESS STATEMENT | 16-07-24 | Design and access statement Design and access statement, Ref: E24-023, June 2024, Osel architecture | ||
| SUPPORTING INFORMATION | 16-07-24 | Arboricultural Method Statement, dated: 18-06-24, Rev. 1, ref: 10074, Crown Tree Consultancy and Tree Protection Plan (Drawing Number CCL10074/TPP Rev. 1) | ||
| SUPPORTING INFORMATION | 16-07-24 | Arboricultural Method Statement, dated: 18-06-24, Rev. 1, ref: 10074, Crown Tree Consultancy and Tree Protection Plan (Drawing Number CCL10074/TPP Rev. 1) | ||
| SUPPORTING INFORMATION | 16-07-24 | BS 5837 Arboricultural Report Impact Assessment, Dated 19th June 2024, ref: 10074, Crown Tree Consultancy | ||
| SUPPORTING INFORMATION | 16-07-24 | Tree Report Drawings Tree Constraints Plan (CCL 10074B/TCP Rev.1), Impact Assessment Plan (CCL 10074B/IAP Rev. 1), Arboricultural Method Statement (CCL 10074 Rev. 1), Tree Protection Plan (CCL 10074/TPP Rev.1) | ||
| SUPPORTING INFORMATION | 16-07-24 | Flood Risk Assessment Flood Risk Assessment & SuDS Drainage Strategy, Ref: 4401/2023, Rev. C, June 2024, EAS | ||
| SUPPORTING INFORMATION | 16-07-24 | Noise survey Environmental Noise Survey and Acoustic Design Statement Report, ref: 25776/ADS2, dated: 9 February 2023, Hann Tucker Associates | ||
| SUPPORTING INFORMATION | 16-07-24 | Daylight and Sunlight Assessment Daylight and Sunlight Assessment, Job No.5717, dated: June 2024, Issue No.2, T16 Design | ||
| SUPPORTING INFORMATION | 16-07-24 | Sustainability appraisal Sustainability Statement, Job No: 5717, dated: July, 2024, Issue No: 1, T16 Design | ||
| SUPPORTING INFORMATION | 16-07-24 | Energy Statement Energy Statement for Planning, Job No: 5717, Issued: June, 2024, Issue No.: 1, T16 Design | ||
| SUPPORTING INFORMATION | 16-07-24 | Full SAP calculation printout, dated: 13/06/2024, Elmhurst Energy | ||
| SUPPORTING INFORMATION | 16-07-24 | BD 0205 SD 101 R06 Illustrative Landscape Section A-A | ||
| SUPPORTING INFORMATION | 16-07-24 | BD 0205 SD 102 R06 Illustrative Landscape Section B-B | ||
| SUPPORTING INFORMATION | 16-07-24 | Landscape report Landscape report, dated: 21st June 2024, ref: BD 0205 SD 401 R07, B|D landscape architects | ||
| SUPPORTING INFORMATION | 16-07-24 | BD 0205 SD 801 R07 Illustrative Landscape masterplan | ||
| SUPPORTING INFORMATION | 16-07-24 | Travel plan Draft Residential Travel plan, June 2024, Mayer Brown | ||
| SUPPORTING INFORMATION | 16-07-24 | Transport assessment Transport Statement, June 2024, Mayer Brown | ||
| SUPPORTING INFORMATION | 16-07-24 | Phase 1: Preliminary Risk Assessment Land Contamination Assessment (Sections 14.5-19.1), ref: HMD-439-9137610, Groundsure | ||
| SUPPORTING INFORMATION | 16-07-24 | Phase 1: Preliminary Risk Assessment Land Contamination Assessment (Sections 20.1-21.10 and Appendix B), ref: HMD-439-9137610, Groundsure | ||
| SUPPORTING INFORMATION | 16-07-24 | Phase 1: Preliminary Risk Assessment Phase 1: Preliminary Risk Assessment, February 2023, V2, Phlorum | ||
| SUPPORTING INFORMATION | 16-07-24 | Phase 1: Preliminary Risk Assessment Land contamination assessment, Groundsure plans | ||
| SUPPORTING INFORMATION | 16-07-24 | Phase 1: Preliminary Risk Assessment Land contamination assessment, Groundsure plans | ||
| SUPPORTING INFORMATION | 16-07-24 | Phase 1: Preliminary Risk Assessment Land contamination assessment (Sections 2.3- 14.4), ref: HMD-439-9137610, Groundsure | ||
| SUPPORTING INFORMATION | 16-07-24 | Drawing List Drawing List, Osel Architecture | ||
| SUPPORTING INFORMATION | 16-07-24 | Ecological Assessment Ecological Assessment, Eco3528, dated: 26 June 2024, GS Ecology | ||
| SUPPORTING INFORMATION | 16-07-24 | Biodiversity gain plan Biodiversity Net Gain Calculation, Ref: ECO3528b, dated: 26 June 2024, GS Ecology | ||
| SUPPORTING INFORMATION | 16-07-24 | Fire Statement Report Fire Statement Report, Rev. 0, June 2024, Accendo Fire Safety Services | ||
| SUPPORTING INFORMATION | 16-07-24 | Air Quality Assessment Air Quality Assessment, ref: J0866/1/F1, dated: 21 June 2024, Air Quality Assessments Ltd | ||
| SUPPORTING INFORMATION | 16-07-24 | Schedule Of Accommodation Schedule of Accommodation- Status Park E21-038, Osel Architecture | ||
| ADVERTISEMENT NOTICE | 19-12-24 | Advertised in Gazette 18.12.24 | ||
| ADDITIONAL DOCUMENTS | 16-07-24 | Financial Viability Assessment, June 2024, James.R.Brown | ||
| FLOOD AND DRAINAGE ASSESSMENT | 27-04-25 | FRA&SuDS Status Park Flood Risk Assessment & SuDS Drainage Strategy - 22/4/25 | ||
| TREE/LANDSCAPING REPORT | 27-04-25 | BD 0205 SD 401 R09 Landscape Report 22/4/25 |
Decision Documentation
| There are no documents for this section |
