DOCUMENTS

Application Forms
APPLICATION FORM 07-05-24 Application Form - Without Personal Data

Plans
LOCATION PLAN 07-05-24 2190-01 The location plan
PHOTOGRAPHS (Supporting info) 07-05-24 CGI Image - Proposed Building CGI Image - Proposed Building
PHOTOGRAPHS (Supporting info) 07-05-24 CGI Image _ Exterior cornice stone CGI Image _ Exterior cornice stone
PHOTOGRAPHS (Supporting info) 07-05-24 SUPERSEDED SUPERSEDED_Titan multi brick
DESIGN ACCESS STATEMENT (FULL DOCUMENT) 15-08-24 SUPERSEDED SUPERSEDED _ Landscape Design Statement-Version V5 Design, prepared by Lauren Munton Gardens, dated 15.08.24 _ received 15.08.24
SITE LAYOUT - PROPOSED 07-05-24 SUPERSEDED SUPERSEDED_Proposed site layout plan
EXISTING PLAN 10-06-24 2190-05 and 2190-06 2190.05 and 06 extg Pavilion Plans and Elevs _ received 10.06.24
PROPOSED FLOOR PLANS 07-05-24 SUPERSEDED SUPERSEDED_Proposed Floor Plans
PROPOSED PLAN AMENDED 10-06-24 2190-02-Rev-A 2190.02 Proposed Elevations-Rev-A _ received 03.06.24
PROPOSED PLAN AMENDED 10-06-24 2190-03-Rev-A 2190.03 Proposed Plans-Rev-A_ received 03.06.24
PROPOSED PLAN AMENDED 10-06-24 2190-04-Rev-A 2190.04 Site Layout Plan-Rev-A _ received 03.06.24
PROPOSED PLAN AMENDED 10-06-24 SUPERSEDED SUPERSEDED_Landscape Design Statement-Version V4.2 Design, prepared by Lauren Munton Gardens, dated 02.05.24 _ received 03.06.24
PROPOSED PLAN 27-06-24 2190-05 Proposed Section _ received 27.06.24
PROPOSED PLAN 03-03-25 Proposed BNG, dated 30.01.2024 Proposed BNG, dated 30.01.2024 _ received 30.01.2025
PROPOSED ELEVATIONS 07-05-24 SUPERSEDED SUPERSEDED_Proposed Elevations

Supporting Documentation
DESIGN AND ACCESS STATEMENT 07-05-24 Design and Access Statement-REV-0 Design and Access Statement-REV-0, prepared by CR Design Services, dated 23.01.24
SUPPORTING INFORMATION 07-05-24 SUPERSEDED SUPERSEDED_Landscape Design Statement-Version V4.1 Design, prepared by Lauren Munton Gardens, dated 08.03.24
SUPPORTING INFORMATION 07-05-24 Risk Assessment Form_Site Set Up, dated 03.08.2024 Risk Assessment Form_Site Set Up, dated 03.08.2024
SUPPORTING INFORMATION 07-05-24 Risk Assessment From_Demolition Works_03.08.2024 Risk Assessment From_Demolition Works_dated 03.08.2024
SUPPORTING INFORMATION 07-05-24 Risk Assessment Form_Tree Protection_03.08.2 Risk Assessment Form_Tree Protection_dated 03.08.2024
SUPPORTING INFORMATION 07-05-24 Risk Assessment Form_Sequence of the Site Works Risk Assessment Form_Sequence of the Site Works_dated 03.08.2024
SUPPORTING INFORMATION 07-05-24 SuDS Appendix B_Sewer Map SuDS Appendix B_Sewer Map
SUPPORTING INFORMATION 07-05-24 SuDS Appendix C_3948720132 SuDS Appendix C_Drainage Document, Greenfield Run Off Rates, ref: 3948720132, dated 29.05.2023
SUPPORTING INFORMATION 07-05-24 SuDS Appendix C_3449361231 SuDS Appendix C_Drainage Document, Surface Water Storage, Ref 3449361231, dated 02.04.2024
SUPPORTING INFORMATION 07-05-24 SuDS Appendix D_Rainwater Harvesting Tank SuDS Appendix D_Drainage Document, Rainwater Harvesting Tank, prepared by Graf UK Ltd
SUPPORTING INFORMATION 07-05-24 SuDS Appendix D_Water Supply SuDS Appendix D_Water Supply, prepared by Graf UK Ltd
SUPPORTING INFORMATION 07-05-24 SuDS Appendix D_Rainwater Underground Tank SuDS Appendix D_Rainwater Underground Tank, prepared by Graf
SUPPORTING INFORMATION 07-05-24 SuDS Appendix E_101-Rev-B SuDS Appendix E_Proposed SuDS Scheme
SUPPORTING INFORMATION 07-05-24 SuDS Appendix F_23005 SuDS Appendix F_Drainage Maintenance Schedule, reference 23005, prepared by Maximum Construction
SUPPORTING INFORMATION 07-05-24 SuDS Appendix G_C1008600 SuDS Appendix G_Drainage Documentation, Ref: C1008600, prepared by Happy Drains, dated 13.06.2023
SUPPORTING INFORMATION 07-05-24 SuDS Appendix G_C1008600 SuDS Appendix G_Drainage documentation
SUPPORTING INFORMATION 07-05-24 Topsoil Report Soil Report, Report Number 23-38800-2, prepared by Eurofins, dated 01.12.2023
SUPPORTING INFORMATION 07-05-24 Tree Survey & AIA Tree Survey and Arboricultural Impact Assessment-Rev-2.0, prepared by ROAVR Group, dated 22.03.2024
SUPPORTING INFORMATION 10-06-24 Titan-Multi Facing Brick Titan-Multi Facing Brick _ received 3 June
SUPPORTING INFORMATION 10-06-24 SuDS and Drainage Assessment-Rev-02 SuDS and Drainage Assessment-Rev-02, Ref: 23005, prepared by Vazquez Besada Consulting, dated 05.04.24 _ received 3 June
SUPPORTING INFORMATION 15-01-25 SUPERSEDED SUPERSEDED _ The Statutory Biodiversity Metric, dated 14.01.2025
SUPPORTING INFORMATION 31-01-25 BNG Baseline, dated 30.01.2024 BNG Baseline, dated 30.01.2024
SUPPORTING INFORMATION 31-01-25 Landscape Design Statement-Version V6 Landscape Design Statement-Version V6, prepared by Lauren Munton Gardens, dated 28.01.2025
SUPPORTING INFORMATION 31-01-25 Preliminary Ecological Appraisal Report, Version 1 Preliminary Ecological Appraisal Report, Version 1.0, prepared by ROAVR Group, dated 30.01.2025
SUPPORTING INFORMATION 31-01-25 The Statutory Biodiversity Metric, dated 29.01.25 The Statutory Biodiversity Metric, dated 29.01.2025
ADVERTISEMENT NOTICE 23-10-24 West London Gazette Adv 10.07.2024
SITE NOTICE 10-07-24 Site Notice 10/07/2024
ADDITIONAL DOCUMENTS 10-06-24 SuDs Appendix A _ 2190-04 SuDS Appendix A _ received 10.06.24

Decision Documentation
DECISION NOTICE 05-03-25
OFFICERS REPORTS 05-03-25