DOCUMENTS
Application Forms
| APPLICATION FORM | 22-09-23 | Application Form - Without Personal Data |
Plans
| LOCATION PLAN | 22-09-23 | SRP1077-NVB-00-XX-D-L-1301 Rev P02 The location plan | ||
| SITE LAYOUT - EXISTING | 22-09-23 | SRP1077-NVB-00-XX-D-L-1302 Rev P02 Existing Site Plan | ||
| SITE LAYOUT - PROPOSED | 22-09-23 | SRP1077-NVB-00-XX-D-L-1304 Rev P01 FINAL Proposed Site Plan (after temp building is removed) | ||
| SITE LAYOUT - PROPOSED AMENDED | 19-01-24 | SRP1077-NVB-00-XX-D-L-1303 Rev P07 Amended Temporary Proposed site plan 19/01/24 | ||
| NOISE ASSESSMENT | 22-09-23 | Noise Impact Assessment- Temporary Building Noise impact assessment | ||
| NOISE ASSESSMENT | 22-09-23 | P5314-R1-V1 Noise impact assessment | ||
| PROPOSED AND EXISTING SECTIONS | 22-09-23 | SRP1077-NVB-00-XX-D-L-1305 Rev p02 Existing and Proposed Site Sections 1 of 2 | ||
| PROPOSED AND EXISTING SECTIONS | 22-09-23 | SRP1077-NVB-00-XX-D-L-1306 Rev P02 Existing and Proposed Site Sections 2 of 2 | ||
| PROPOSED FLOOR PLANS | 22-09-23 | 37041-PML-B2-00-DR-A-0001 Rev P2 Proposed Ground Floor Plan | ||
| PROPOSED FLOOR PLANS | 22-09-23 | 37041-PML-B2-01-DR-A-0001 Rev P2 Proposed First Floor Plan | ||
| PROPOSED PLAN | 22-09-23 | SRP1077-NVB-00-XX-D-L-1303 Rev P05 Temporary Proposed Site Plan - superseded | ||
| PROPOSED PLAN | 22-09-23 | SRP1077-NVB-00-XX-D-L-1304 Rev P01 Temporary Proposed Site-Wide Plan - superseded | ||
| PROPOSED PLAN | 19-01-24 | SRP1077-NVB-00-XX-D-L-1304 Rev P02 Amended temporary site wide plan 19/01/24 | ||
| PROPOSED PLAN | 30-01-24 | SRP1077-NVB-00-XX-D-L-3453 Rev C02 Ramp and stepped access detail drawing | ||
| PROPOSED ELEVATIONS | 22-09-23 | 17066-RYL-ZZ-DR-M-5501 Rev P1 Proposed Elevations | ||
| PLAN | 22-09-23 | TR002 Rev B Transport assessment Plans 1-5 | ||
| PLAN | 22-09-23 | EW01 REV A Demolition Phasing Plan | ||
| PLAN | 22-09-23 | SA01 Site Access Routes | ||
| PLAN | 22-09-23 | SC01 REV B Site Constraints Plan | ||
| PLAN | 22-09-23 | SRP1077-BYG-XX-XX-G-X-0001-S5-C06 Phasing Plans Page No. 1-8 - superseded | ||
| PLAN | 22-09-23 | C3863-HSP-00-00-DR-G-SK100 Rev P03 Topographical and Utility Survey | ||
| PLAN | 22-09-23 | Structural survey Structural survey | ||
| PLAN | 22-09-23 | C3886-HSP-00-00-DR-G-522 Rev P01 Measured Building Survey | ||
| PLAN | 22-09-23 | C3886-HSP-00-00-DR-G-520 Rev P01 Measured Building Survey | ||
| PLAN | 22-09-23 | HSP2022-C3863 STRUCTURAL STAGE - BASIC CONDITION SURVEY | ||
| PLAN | 22-09-23 | Topographical Details Topographical Details Sheets 1 to 4 | ||
| PLAN AMENDED | 08-12-23 | amended Phasing plan Amended Plan - SRP1077-BYG-XX-XX-G-X-0001-S5-C11 |
Supporting Documentation
| DESIGN AND ACCESS STATEMENT | 23-10-23 | PDAS - OCTOBER 2023 TEMP BUILDING - PDAS - OCTOBER 2023 | ||
| SUPPORTING INFORMATION | 22-09-23 | Biodiversity Net Gain Assessment Biodiversity survey and report - ARBTECH | ||
| SUPPORTING INFORMATION | 22-09-23 | Preliminary Ecological Appraisal Preliminary Ecological Appraisal and Preliminary Roost Assessment - ARB TECH | ||
| SUPPORTING INFORMATION | 22-09-23 | Transport Statement Transport Assessment - August 2023 | ||
| SUPPORTING INFORMATION | 22-09-23 | Construction Environmental Management Plan Construction Environmental Management Plan Rev A - ROSEDALE COLLEGE | ||
| SUPPORTING INFORMATION | 22-09-23 | Condition Survey CONDITION SURVEY - Y-JD-SCS-09885-22 | ||
| SUPPORTING INFORMATION | 22-09-23 | Building Services Condition Report Building Services Condition Report - Rosedale College | ||
| SUPPORTING INFORMATION | 22-09-23 | DETAILED UNEXPLODED ORDNANCE RISK ASSESSMENT - 759 Explosive risk assessment | ||
| SUPPORTING INFORMATION | 22-09-23 | Asbestos Survey Report and Register Asbestos Management Survey | ||
| SUPPORTING INFORMATION | 22-09-23 | Overshadowing study TEMPORARY BLOCK F OVERSHADOWING STUDY - August 2023 | ||
| SUPPORTING INFORMATION | 22-09-23 | SRP1077-TER-00-00-D-C-9001 Rev P04 Drainage documentation | ||
| SUPPORTING INFORMATION | 22-09-23 | SRP1077-TER-00-00-D-C-9002 rev P04 Drainage documentation | ||
| SUPPORTING INFORMATION | 22-09-23 | SRP1077-TER-00-00-D-C-9003 rev p02 DRAINAGE DETAILS | ||
| SUPPORTING INFORMATION | 22-09-23 | TER-REP-1002-Rev P05 CIVIL ENGINEERING PHILOSOPHY | ||
| SUPPORTING INFORMATION | 22-09-23 | Sewers and Drainage Scoring Sewers and Drainage Scoring - Rosedale College | ||
| SUPPORTING INFORMATION | 08-12-23 | Rosedale College - Construction Environmental Management Plan Nov 23 Rev D | ||
| SUPPORTING INFORMATION | 08-12-23 | Sport England Rebuttal | ||
| SUPPORTING INFORMATION | 08-12-23 | SRP1077-BYG-XX-XX-T-R-0021- Rosedale Construction Method Statement -S5-C03 | ||
| SUPPORTING INFORMATION | 11-12-23 | Carbon calculator - EFAF Energy Statement - Rosedale College - EFAF Temporary Modular Teaching Accommodation | ||
| SUPPORTING INFORMATION | 11-12-23 | Energy Statement - EFAF Energy Statement - Rosedale College - EFAF Temporary Modular Teaching Accommodation | ||
| TREE/LANDSCAPING REPORT | 22-09-23 | Arbtech AIA 01 Arboricultural Impact Assessment | ||
| TREE/LANDSCAPING REPORT | 22-09-23 | Arboricultural Method Statement to BS5837:2012 Arboricultural Method Statement to BS5837:2012 - rosedale college | ||
| TREE/LANDSCAPING REPORT | 22-09-23 | Arbtech TPP 01 Tree Protection Plan- Tree survey | ||
| CULTURAL AND HERITAGE ASSESSMENT | 22-09-23 | Archaeological Desk Based Assessment HPS - Archaeological And Heritage Survey | ||
| FLOOD AND DRAINAGE ASSESSMENT | 22-09-23 | HSP2022-C3886-C&S-FRAS1-536 Flood risk assessment | ||
| FLOOD AND DRAINAGE ASSESSMENT | 22-09-23 | Surface Water Management Plan Surface Water management planS | ||
| LAND ASSESSMENT | 22-09-23 | Phase I Geo-Environmental Desk Study Report HSP CONSULTING - Phase I Geo-Environmental Desk Study Report | ||
| LAND ASSESSMENT | 22-09-23 | EMAPSITE TM LAND DOCS HSP - EMAPSITE TM | ||
| LAND ASSESSMENT | 22-09-23 | PHASE II GEO-ENVIRONMENTAL ASSESSMENT REPORT PHASE II GEO-ENVIRONMENTAL ASSESSMENT REPORT - ROSEDALE COLLEGE |
Decision Documentation
| DECISION NOTICE | 08-03-24 | |||
| OFFICERS REPORTS | 08-03-24 |
