DOCUMENTS
Application Forms
| APPLICATION FORM | 13-11-23 | Application Form - Without Personal Data |
Plans
| LOCATION PLAN | 13-11-23 | NWA-0471-SN-ZZ-DR-A-01-000 Rev P01 A01 - SITE LOCATION Site Location Plan | ||
| SITE LAYOUT - PROPOSED | 23-11-23 | NWA-0471-SW-ZZ-DR-A-A90005SPSP Rev P04 A90 - External Works SW Site Plan Aerial View | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0471-UP1- 00-DR-A-A04000SP Rev C01 A04 - FIRE STRATEGY B1 Ground Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0471-UP1- 00-DR-A-A04000SP Rev C01 A04 - FIRE STRATEGY B1 Ground Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0471-UP1- 01-DR-A-A04010SP Rev C01 A04 - FIRE STRATEGY B1 First Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0471-UP1- 02-DR-A-A04020SP Rev C01 A04 - FIRE STRATEGY B1 Second Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0471-UP1- 03-DR-A-A04030SP Rev C01 A04 - FIRE STRATEGY B1 Third Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0471-UP1- 04-DR-A-A04040SP Rev C01 A04 - FIRE STRATEGY B1 Fourth Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA-0472-EC2-ZZ-DR-A-04005 Rev T01 A04 - FIRE STRATEGY Cable Chamber & Ground Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA-0472-EC2-ZZ-DR-A-04006 Rev T01 A04 - FIRE STRATEGY First & Second Level Deck Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0472-EC2- ZZ-DR-A-04007SP Rev T01 A04 - FIRE STRATEGY Third Level & Cooling Deck Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0472-UP2- 00-DR-A-04000SP Rev T01 A04 - FIRE STRATEGY B2 Ground Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0472-UP2- 01-DR-A-04010SP Rev T01 A04 - FIRE STRATEGY B2 First Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0472-UP2- 02-DR-A-04020SP Rev T01 A04 - FIRE STRATEGY B2 Second Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0472-UP2- 03-DR-A-04030SP Rev T01 A04 - FIRE STRATEGY B2 Third Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0472-UP2- 04-DR-A-04040SP Rev T01 A04 - FIRE STRATEGY B2 Fourth Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA- 0472-UP2- 05-DR-A-04050SP Rev T01 A04 - FIRE STRATEGY B2 Fifth Floor Plan | ||
| PROPOSED PLAN | 23-11-23 | NWA-0473-EC3-ZZ-DR-A-04005 Rev T01 04 - Fire Strategy EC3 Fire Strategy Plans | ||
| PROPOSED PLAN | 23-11-23 | NWA-0473-EC3-ZZ-DR-A-04006 Rev T01 04 - Fire Strategy EC3 Fire Strategy Plans | ||
| PROPOSED PLAN | 23-11-23 | NWA-0473-EC3-ZZ-DR-A-04007 Rev T01 04 - Fire Strategy EC3 Fire Strategy Plans | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA-0473-UP3-00-DR-A-04000SP Rev T04 A04 - FIRE STRATEGY B3 Ground Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA-0473-UP3-01-DR-A-04010SP Rev T04 A04 - FIRE STRATEGY B3 First Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA-0473-UP3-02-DR-A-04020SP Rev T04 A04 - FIRE STRATEGY B3 Second Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA-0473-UP3-03-DR-A-04030SP Rev T04 A04 - FIRE STRATEGY B3 Third Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA-0473-UP3-04-DR-A-04040SP Rev T03 A04 - FIRE STRATEGY B3 Fourth Floor Plan | ||
| PROPOSED FLOOR PLANS | 23-11-23 | NWA-0473-UP3-05-DR-A-04050SP Rev T01 A04 - FIRE STRATEGY B3 Fifth Floor Plan | ||
| PROPOSED ELEVATIONS | 23-11-23 | 149980_130 Rev A GFL Isoclad Elevations | ||
| PROPOSED ELEVATIONS | 23-11-23 | 149980_131 Rev B FFL Isoclad Elevations | ||
| PROPOSED ROOF PLANS | 23-11-23 | ANS-0471-UP1-05-DR-A-A20050 Rev P05 Union Park, Ancillary Block 1 (East) Roof Plan - ANS Irrigation Layout | ||
| PROPOSED ROOF PLANS | 23-11-23 | NWA- 0472-UP2- 06-DR-A-04060SP Rev T01 A04 - FIRE STRATEGY B2 Roof Plan | ||
| PROPOSED SECTIONS | 23-11-23 | NWA- 0471-EC1- ZZ-DR-A-A04800SP Rev C01 04 - Fire Strategy EC1 Fire Strategy Sections | ||
| PROPOSED SECTIONS | 23-11-23 | NWA- 0471-EC1- ZZ-DR-A-A04801SP Rev C01 04 - Fire Strategy EC1 Fire Strategy Sections | ||
| PROPOSED SECTIONS | 23-11-23 | NWA-0471-UP1-ZZ-DR-A-A04800SP A04 FIRE STRATEGY Sections AA & BB | ||
| PROPOSED SECTIONS | 23-11-23 | NWA-0472-EC2-ZZ-DR-A-04800 Rev T01 A04 FIRE STRATEGY 01 & 02 Sections | ||
| PROPOSED SECTIONS | 23-11-23 | NWA-0473-EC3-ZZ-DR-A-04800 Rev T02 04 - Fire Strategy EC3 Fire Strategy Sections | ||
| PROPOSED SECTIONS | 23-11-23 | NWA-0473-UP3-ZZ-DR-A-04800SP Rev T01 A04 - FIRE STRATEGY B3 Sections | ||
| PLAN | 23-11-23 | 149980_132 Rev A Isoclad 3D View | ||
| PLAN | 23-11-23 | S22047182 Fire Safety Strategy Report For Project Union Issue No 08 | ||
| PLAN | 23-11-23 | ANS-0471-AB1-XX-DR-X-000002 Rev C01 Union Park, Ancillary Block 1 (East) ANS Wire and through overlay | ||
| PLAN | 23-11-23 | ANS-0471-AB1-XX-DR-X-000004 Rev C01 Union Park, Ancillary Block 1 (East) ANS Wire and trough overlay | ||
| PLAN | 23-11-23 | ANS-0471-AB1-ZZ-DR-X-000001 Rev P03 Union Park, Ancillary Block 1 (East) ANS Modular Living Wall System P03 | ||
| PLAN | 23-11-23 | ANS-0471-AB2-XX-DR-X-000003 Rev C01 Union Park, Ancillary Block 2 (West) ANS Wire and trough overlay | ||
| PLAN | 23-11-23 | ANS-0471-EC1-00-DR-PH-530003 Rev C01 Union Park, EC Building 1 Ground Floor Plan - ANS Irrigation Layout | ||
| PLAN | 23-11-23 | ANS-0471-EC1-XX-DR-X-00003 Rev C01 Union Park, EC Building 1, ANS Wire and trough overlay | ||
| PLAN | 23-11-23 | ANS-0471-UP1-ZZ-REP-X-000006 Rev P01 MAKUSO Engineering Ltd - Structural Calculation Report | ||
| PLAN | 23-11-23 | ANS-0471-UP1-ZZ-REP-X-000006 RevP01 MAKUSO Engineering Ltd - Structural Calculation Report - DUPLICATE | ||
| PLAN | 23-11-23 | ANS-0471-UP1-ZZ-REP-X-000009 Rev P01 MAKUSO Engineering Ltd - Structural Calculation Report | ||
| PLAN | 23-11-23 | ANS-0471-UP1-ZZ-REP-X-000009 Rev P01 Indicative Plant Palette - Union Park | ||
| PLAN | 23-11-23 | ANS-0471-UP1-ZZ-SOW-X-000010 Rev P02 Union Park - Living Wall Facade Strategy | ||
| PLAN | 23-11-23 | NWA-0471-DC-ZZ-DR-A-31-100 Rev P01 A31-EXTERNAL WALL COMPLETION FACADE FINISHES | ||
| PLAN | 23-11-23 | NWA- 0471-EC1- 04-DR-A-A04007SP Rev C01 04 - Fire Strategy EC1 Fire Strategy Plans | ||
| PLAN | 23-11-23 | NWA- 0471-EC1- ZZ-DR-A-31-100 Rev P01 A31 - External Wall Completion Facade Finishes | ||
| PLAN | 23-11-23 | NWA-0471-EC1-ZZ-DR-A-A04005SP Rev C01 04 - Fire Strategy EC1 Fire Strategy Plans | ||
| PLAN | 23-11-23 | NWA- 0471-EC1- ZZ-DR-A-A04006SP Rev C01 04 - Fire Strategy EC1 Fire Strategy Plans | ||
| PLAN | 23-11-23 | NWA- 0471-EC1- ZZ-DR-A-A04800SP Rev C01 04 - Fire Strategy EC1 Fire Strategy Sections | ||
| PLAN | 23-11-23 | NWA- 0471-EC1- ZZ-DR-A-A04801SP Rev C01 04 - Fire Strategy EC1 Fire Strategy Sections | ||
| PLAN | 23-11-23 | NWA-0471-UP1-ZZ-DR-A-03-850 Rev P01 A03 - PLANNING Green Wall MAT | ||
| PLAN | 23-11-23 | NWA-0471-UP1-ZZ-DR-A-A31706SP_A31 Rev P05 A31 - EXTERNAL WALL COMPLETION B1 External Cladding Elevations - Green Wall | ||
| PLAN | 23-11-23 | NWA-0471-UP1-ZZ-DR-A-SK0036 rev P01 SK - SKETCHES AB1_Green Wall Cladding_Mitigating detail | ||
| PLAN | 23-11-23 | NWA-0471-VR1-00-DR-A-A04005SP Rev C01 A04 FIRE STRATEGY Fire Strategy - Visitor Reception Centre | ||
| PLAN | 23-11-23 | NWA-0472-EC2-ZZ-DR-A-04007 Rev T01 Third Level & Cooling Deck Plan | ||
| PLAN | 23-11-23 | NWA-0473-EC3-ZZ-DR-A-04005 Rev T01 04 - Fire Strategy EC3 Fire Strategy Plans | ||
| PLAN | 23-11-23 | NWA-0473-EC3-ZZ-DR-A-04006 Rev T01 04 - Fire Strategy EC3 Fire Strategy Plans | ||
| PLAN | 23-11-23 | NWA-0473-EC3-ZZ-DR-A-04007 Rev T01 04 - Fire Strategy EC3 Fire Strategy Plans | ||
| PLAN | 23-11-23 | NWA-0473-EC3-ZZ-DR-A-04800 Rev T02 04 - Fire Strategy EC3 Fire Strategy Sections | ||
| PLAN | 23-11-23 | NWA-0473-EC3-ZZ-DR-A-04801 Rev T01 04 - Fire Strategy EC3 Fire Strategy Sections | ||
| PLAN | 23-11-23 | NWA- 0473-VR2- 00-DR-A-A04005SP Rev T01 A04 FIRE STRATEGY Fire Strategy - Visitor Reception Centre | ||
| PLAN | 23-11-23 | P1152-ARK-DWG-1001-SHT2 Rev AB UNION PARK 66/11.9/11.9kV SUBSTATION ELEVATIONS | ||
| PLAN | 23-11-23 | P1152-ARK-DWG-1001 SHT-3 Rev AB UNION PARK 66/11.9/11.9kV SUBSTATION CABLE TRAY LAYOUT | ||
| PLAN | 19-12-23 | NWA- 0471-UP1- ZZ-DR-A-A20700SP Rev C01 A20 - GENERAL ARRANGEMENT B1 North and South Elevations | ||
| PLAN | 19-12-23 | NWA- 0471-UP1- ZZ-DR-A-A20701SP Rev C01 A20 - GENERAL ARRANGEMENT B1 East and West Elevations | ||
| PLAN | 19-12-23 | NWA- 0471-UP1- ZZ-DR-A-A31700SP Rev P05 A31 - EXTERNAL WALL COMPLETION B1 Curtain Wall Elevations | ||
| PLAN | 19-12-23 | NWA- 0471-UP1- ZZ-DR-A-A31701SP Rev P04 A31 - EXTERNAL WALL COMPLETION B1 Curtain Wall Elevations | ||
| PLAN | 19-12-23 | NWA- 0471-UP1- ZZ-DR-A-A31702SP Rev P05 A31 - EXTERNAL WALL COMPLETION B1 External Cladding Elevations - Green Wall | ||
| PLAN | 19-12-23 | NWA-0471-UP1-ZZ-DR-A-A31704SP Rev P07 A31 - EXTERNAL WALL COMPLETION B1 External Cladding Elevations | ||
| PLAN | 19-12-23 | NWA- 0471-UP1- ZZ-DR-A-A31705SP Rev P06 A31 - EXTERNAL WALL COMPLETION B1 External Cladding Elevations | ||
| PLAN | 19-12-23 | NWA- 0471-UP1- ZZ-DR-A-A31706SP Rev P05 A31 - EXTERNAL WALL COMPLETION B1 External Cladding Elevations - Green Wall |
Supporting Documentation
| SUPPORTING INFORMATION | 23-11-23 | S22047182 Issue no. 8 Fire Safety Strategy Report SUPERSEDED | ||
| SUPPORTING INFORMATION | 23-11-23 | ANS-0471-UP1-ZZ-REP-X-000009 Living Wall Design Proposal: Proposed Plant Species | ||
| SUPPORTING INFORMATION | 23-11-23 | NWA-0471-VR1-00-DR-A-A04005SP Fire Strategy_Visitor Reception Centre_C01 | ||
| SUPPORTING INFORMATION | 23-11-23 | NWA-0473-VR2-00-DR-A-04005 - A04 FIRE STRATEGY Fire Strategy - Visitor Reception Centre_Ver2 | ||
| SUPPORTING INFORMATION | 23-01-24 | GRST02 Rev 1.02 Green Roof - Warm Roof | ||
| SUPPORTING INFORMATION | 23-01-24 | GRST12 Rev 1.00 Roof Drainage - RWO Access Chamber & Hard / Soft Landscaping Detail | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS Living Wall System - Maintenance Schedule for Union Park | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-AB1-ZZ-DR-X-000001 Rev C01 Union Park, Ancillary Block 1 (East) ANS Overlay - Wall-C | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-AB1-ZZ-DR-X-000002 Rev C02 Union Park, Ancillary Block 1 (East) ANS Overlay - Wall-B & D | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-AB1-ZZ-DR-X-000012 Rev C01 Union Park, Ancillary Block 1 (East) ANS Hanging Rails - Wall-C | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-AB1-ZZ-DR-X-000013 Rev C01 Union Park, Ancillary Block 1 (East) ANS Irrigation Zones - Wall-C | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-AB1-ZZ-DR-X-000015 Rev C01 Union Park, Ancillary Block 1 (East) ANS Hanging Rails - Wall B&D | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-AB1-ZZ-DR-X-000016 Rev C01 Union Park, Ancillary Block 1 (East) ANS Irrigation Zones - Wall B & D | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-AB2-XX-DR-X-000003 Rev C02 Union Park, Ancillary Block 2 (West) ANS Overlay Wall A & E | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-AB2-ZZ-DR-X-000017 Rev C01 Union Park, Ancillary Block 2 (West) ANS Hanging Rails - Walls A & E | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-AB2-ZZ-DR-X-000018 Rev C01 Union Park, Ancillary Block 2 (West) ANS Irrigation Zones Wall A & E | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-SW-ZZ-TS-X-000001 Rev P01 Technical Submittal - ANS Living Wall Module | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-SW-ZZ-TS-X-000002 Rev P01 Green Wall Drip Line - ANS are proposing to use this irrigation drip line within the living wall | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-SW-ZZ-TS-X-000003 Rev P01 Technical Submittal - PE / PP Tube | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-SW-ZZ-TS-X-000004 Rev P01 Technical Submittal - Kayflow Squareline gutters for the base of the living wall | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-SW-ZZ-TS-X-000005 Rev P01 ANS Living Wall System - Specification | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-UP1-05-DR-X-A20050 Rev C01 Union Park, Ancillary Block 1 (East) Roof Plan - ANS Irrigation Layout | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-UP1-ZZ-REP-X-000014 Rev P01 Indicative Planting Plans - Union Park | ||
| SUPPORTING INFORMATION | 23-01-24 | ANS-0471-UP1-ZZ-SOW-X-000010 Rev P02 Living Wall Facade Strategy | ||
| SUPPORTING INFORMATION | 23-01-24 | Original Planning Application - Condition 10 | ||
| SUPPORTING INFORMATION | 23-01-24 | Condition 10 & 9 (Slot In) Documents needed for Green Roof and Walls | ||
| SUPPORTING INFORMATION | 23-01-24 | Species List for Union Park Living Wall | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-SWZZ- DR-A-A95203SP Rev P02 A95 Cleaning & Maintenance Strategy External Works Overall Access and Maintenance | ||
| SUPPORTING INFORMATION | 23-01-24 | WA- 0471-UP1- 05-DR-A-A27064SP Rev p05 A27 - ROOFS B1 Roof Type Plan | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A20700SP Rev C01 A20 - GENERAL ARRANGEMENT B1 North and South Elevations | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A20701SP Rev C01 A20 - GENERAL ARRANGEMENT B1 East and West Elevations | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A27901SP Rev P02 A27 - ROOFS Roof Sequencing Details 01 | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A27902SP Rev P03 A27 - ROOFS Roof Sequencing Details 02 | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A27903SP Rev P02 A27 - ROOFS Roof Sequencing Details 03 | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A27904SP Rev P01 A27 - ROOFS Roof Sequencing Details 04 | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A31700SP Rev P05 A31 - EXTERNAL WALL COMPLETION B1 Curtain Wall Elevations | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A31701SP Rev P04 A31 - EXTERNAL WALL COMPLETION B1 Curtain Wall Elevations | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A31702SP Rev P05 A31 - EXTERNAL WALL COMPLETION B1 External Cladding Elevations - Green Wall | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA-0471-UP1-ZZ-DR-A-A31704SP Rev P07 A31 - EXTERNAL WALL COMPLETION B1 External Cladding Elevations | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A31705SP Rev P06 A31 - EXTERNAL WALL COMPLETION B1 External Cladding Elevations | ||
| SUPPORTING INFORMATION | 23-01-24 | NWA- 0471-UP1- ZZ-DR-A-A31706SP Rev P05 A31 - EXTERNAL WALL COMPLETION B1 External Cladding Elevations - Green Wall | ||
| SUPPORTING INFORMATION | 23-01-24 | Telescopic Boom Lifts - Genie SX - 150 | ||
| SUPPORTING INFORMATION | 23-01-24 | Typical Extensive Green Roof Section | ||
| SUPPORTING INFORMATION | 25-01-24 | S22047182 Issue no. 9 Fire Safety Strategy Report AMENDED | ||
| SUPPORTING INFORMATION | 25-01-24 | HPF-0471-SWS-BG-DR-C-92160 Rev. C01 Water Supply Site Layout | ||
| SUPPORTING INFORMATION | 25-01-24 | NWA-0471-EC1-ZZ-DR-A-A04005SP Rev. C01 EC1 Fire Strategy Plans | ||
| SUPPORTING INFORMATION | 25-01-24 | NWA-0471-UP1-00-DR-A-A04000SP Rev. C01 A04 - Fire Strategy - B1 Ground Floor Plan | ||
| SUPPORTING INFORMATION | 25-01-24 | NWA-0471-VR1-00-DR-A-A04005SP Rev. C01 A04 Fire Strategy - Visitor Reception Centre |
Decision Documentation
| DECISION NOTICE | 02-02-24 | |||
| OFFICERS REPORTS | 02-02-24 |