DOCUMENTS
Application Forms
| APPLICATION FORM | 31-10-25 | Application Form redacted Application Form - Without Personal Data |
Plans
| LOCATION PLAN | 31-10-25 | 2190-01 A Location and Block plan | ||
| SITE LAYOUT - PROPOSED | 31-10-25 | 2190-04 B Proposed Site Layout plan | ||
| PROPOSED PLAN | 31-10-25 | 2190-03 B Proposed FPs and Roof plan | ||
| PROPOSED PLAN | 31-10-25 | 101 C Proposed SuDS Scheme |
Supporting Documentation
| DESIGN AND ACCESS STATEMENT | 31-10-25 | Design, Access & Heritage Statement, Revision 1, 20.10.25, CR Design Services | ||
| ADVERTISEMENT NOTICE | 17-12-25 | West London Gazette 17.12.2025 | ||
| SITE NOTICE | 10-12-25 | Photo of Site Notice | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | SuDS and Drainage Assessment, Revision: 03, Issue Date: 05 April 2024, Vazquez Besada Consulting | ||
| ECOLOGY REPORT | 31-10-25 | Preliminary Ecological Appraisal Report (PEAR), 16/10/2025 Version. 1.2, ROAVR Group | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | Asset Location Search Sewer Map | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | Greenfield Runoff estimation, hr wallingford | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | Surface storage water requirements for site, hr wallingford | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | Rainwater harvesting tank size calculator to BS 8515:2009, Graf UK Ltd | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | Platin House Direct Package, Graf | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | Installation and maintenance instructions for PLATIN Rainwater Underground Tank, Graf | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | 23005 - Drainage Maintenance Schedule | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | Project drawings, Happy Drains | ||
| FLOOD AND DRAINAGE ASSESSMENT | 31-10-25 | Letter, Date 2023-06-14, Happy Drains | ||
| TREE/LANDSCAPING REPORT | 20-11-25 | Landscape Design statement, V7 Design, Date 03/10/25, Lauren Munton Gardens |
Decision Documentation
| DECISION NOTICE | 15-01-26 | |||
| OFFICERS REPORTS | 15-01-26 |
