DOCUMENTS
Application Forms
| APPLICATION FORM | 08-10-24 | Application Form - Without Personal Data |
Plans
| EXISTING FLOOR PLANS | 08-10-24 | 71805-BM3- XX-L4-DR-A-204-Rev-C1 Fourth Floor Plan | ||
| EXISTING FLOOR PLANS | 08-10-24 | 71805-BM3- XX-L6-DR-A-206-Rev-C1 Sixth Floor Plan | ||
| EXISTING FLOOR PLANS | 08-10-24 | 71805-BM3- XX-L7-DR-A-207-Rev-C1 Seventh Floor Plan | ||
| PROPOSED ROOF PLANS | 08-10-24 | 71805-BM3- XX-L8-DR-A-208-Rev-C1 Eight Floor Plan | ||
| PLAN | 08-10-24 | 71805-BM3- XX-ZZ-DR-A-2030-Rev-C1 Roof Build Ups | ||
| PLAN | 08-10-24 | 71805-GTA-ZZ-XX-DR-C-1601-Rev-J Drainage Layout Plan | ||
| PLAN | 08-10-24 | 71805-GTA-ZZ-XX-DR-C-1702-Rev-C Private Drainage Details Sheet 2 | ||
| PLAN | 08-10-24 | 71805-GTA-ZZ-XX-DR-C-1821-Rev-C Site Levels Plan | ||
| PLAN | 08-10-24 | 71805-GTA-ZZ-XX-DR-C-1901-Rev-E Private External Works Construction Details |
Supporting Documentation
| SUPPORTING INFORMATION | 08-10-24 | Storm Sewer Design by the Modified Rational Method Storm Sewer Design, prepared by the Modified Rational Method, dated 10.03.2023 | ||
| SUPPORTING INFORMATION | 08-10-24 | IKO Permatec Brochure IKO Permatec Versatile Hot Melt Waterproofing Systems (Brochure) | ||
| SUPPORTING INFORMATION | 08-10-24 | Runoff Volumes Run Off Volume for the Greenfield Existing and Proposed Rate for the 1 in 100-year 6 hr Storm Event | ||
| SUPPORTING INFORMATION | 08-10-24 | Letter prepared by Thames Water Letter, RE Notice of consent to connect to a public sewer / public lateral drain, prepared by Thame Water, dated 17.05.2023 |
Decision Documentation
| DECISION NOTICE | 20-11-24 | |||
| OFFICERS REPORTS | 20-11-24 |
